as of 2026-10-27
Report date
Oct 27, 2026
Web data generated
2026-10-27 10:40 AM PDT
Alpha report generated
2026-10-27 10:39 AM PDT
Alpha web build revision a0db9018688dAlpha web package 20261027T174132245783Z-8f3a46c3207d

BE

Bloom Energy

BE

IndustrialsElectrical Equipment & Parts$60.3B market cap
Meridian score98Rank #18 of 695as of Oct 27StrongReview notes
ResearchAvoidResearch view at today's price $203.92 (Oct 26, 2026): price 49% above fair valueReport Oct 22, 2026 (5 d old)
Fair value · restated Oct 26, 2026$137
Record view · restated Oct 26, 2026 · at the report price $217.77Avoid · price 59% above fair value
Close · Oct 26, 2026$203.92

Our model’s output

Inference

Price $203.92 on Oct 26, 2026 is 49% above our fair value $137: Avoid (Hold below $161); the Street averages $296

US dollars per share

Volume growth 2028-31 vs central swings value from $95.85 to $174, the widest of the drivers

US dollars per share, one driver at our 10th and 90th percentile and the rest central ($137)

Volume growth 2028-31 vs central: the price needs 13.4% against our 0.0%

Any one of these on its own would justify the price; each in its own unit, the band our 10th to 90th percentile

The price is justified in 20-50% of our scenarios; the middle outcome is $124

US dollars per share; 4,000 simulated outcomes

Results due Feb 4, 2027: our figure is above the Street's on 1 of 1 metrics

Each metric in the unit its name gives; the band is our low to high

QualityB Quality: 86th percentile
MomentumB Momentum: 83rd percentile
GrowthA Growth: 99th percentile
ValuationE Valuation: 0th percentile
ExpectationsA Expectations: 98th percentile

Evidence to review

  • Financial data warning: Revenue source review
  • Financial data warning: Gross profit source review
  • Financial comparability: Growth comparisons span material statement or share-base changes.
  • Financial comparability: Leverage changed across a non-comparable reporting window.
ResearchLatest: Avoid · price 49% above fair value · fair value $137 · restated Oct 26, 2026Show reportHide report
Report

We value BE at $137 a share. The report's $217.77 price (Oct 22, 2026) was 59% above fair value: Avoid.

Restated Oct 26, 2026 (method case-spread-2026-10-24); the report's original value was $137, Avoid.

Five-year return
0.2%
a year, at the report's price
Return
-6.4%
vs SPY
-6.5%
vs benchmark
-6.5%

Close of Oct 22, 2026 to close of Oct 26, 2026

What would change the view

  • Volume growth in 2028-2031 about 15 points a year faster than our central path (the optimistic world, 7 GW in 2031): the price is justified
  • A 2027 revenue guide midpoint above $6.6B, our full 2027 central, given Bloom's habit of low first guides: our central is too low
  • Product GAAP gross margin above 41% for a full year: the price premium is lasting rather than fading after 2028
  • Product GAAP gross margin below 33% for a full year, or price per kilowatt falling more than 5% a year: the pessimistic world
  • Turbine lead times back to about two years before 2029, or a large cloud capex cut: the pessimistic world

Catalysts

  1. Q4 2026 results (tentative date), the 2027 guide and the year-end product backlog. We expect Q4 revenue of $1.70B (range $1.35-1.96B) and a 2027 revenue guide midpoint near $5.6B; each $1B of 2027 revenue above our $6.6B is worth about $28 a share
  2. The large cloud companies' 2027 capital spending guides with their Q4 results (late January to early February 2027; we use 2027-02-05). A cut is our pessimistic world
  3. Oracle's Project Jupiter in New Mexico: whether the 2028 start holds after the September 2026 force majeure notice (press). A delay past 2028 moves 2027 toward 1.75 GW, -$23 a share

Next results preview

Results expected Feb 4, 2027. Street: FMP earnings revenueEstimated, captured Oct 22, 2026, 7:40 PM PDT.

MetricOursOur rangeStreet
Revenue ($B)1.71.35 to 1.961.23
Diluted EPS ($, non-GAAP)1.371.04 to 1.61none
Product gross margin (GAAP)0.380.36 to 0.4none
Operating cash flow ($M)250-100 to 600none
2027 revenue guide midpoint ($B)5.64.8 to 6.6none
Product backlog at year-end ($B)118 to 16none

This text argues the original call. The current figures are at the top.

Avoid: Bloom is now a profitable AI power supplier, but at $217.77 it trades 59% above our $137 fair value. It sells fuel cells that make electricity from natural gas on the customer's own site. AI data centres buy them because the grid cannot connect new load for years and gas turbines are sold out, while Bloom delivered Oracle's Utah site in under two months (management, Q3 2026 call). Revenue more than doubled in Q3 2026 (+138% to $1,236M), product margins rose and Bloom raised its 2026 revenue guide for the third time, to $4.4-4.6B from $3.1-3.3B in February.

Our central case has volume rising from about 1.3 GW in 2026 to 4.2 GW in 2031 and revenue from $4.5B to $13.5B, with operating margins after stock pay near 27%. Bloom holds its price through 2029, while GE Vernova, the largest turbine maker, is sold out (its 2026-07-22 call), and cuts it 3% a year after. Even that is worth $137, because the growth slows to 9% by 2031 and the business then earns returns closer to an industrial equipment maker's. Most of the value is the exit: $110 of the $137 is the 2031 exit price brought back to today, $18 is the cash earned on the way and $9 is today's net cash and tax losses. The price needs about 6.4 GW in 2031 instead of 4.2, close to our optimistic world.

Terms. The central case is our best estimate; the pessimistic and optimistic cases are coherent alternative worlds we weight 25% each. GW is gigawatts of fuel-cell capacity shipped and recognised as revenue in a year; Bloom does not publish it, so we infer it from revenue at about $2,950 per kilowatt (from AEP's reported order, press). Time to power is how fast a customer gets electricity after ordering. Operating margin after stock pay is GAAP-like operating profit over revenue. Fade is our long fade: returns on new investment glide from today's level to a mature level over 15 years. Outside view is the price the 2031 operating profit would fetch at the median enterprise-value-to-operating-profit multiple of five power-equipment makers.

1. What Bloom sells and what limits it

Bloom makes solid-oxide fuel cells in Fremont, California ("Energy Servers"). They run on natural gas (or hydrogen), make power without combustion and emit little besides carbon dioxide, which makes local air permits easier than for turbines or engines (management). Revenue in Q3 2026 was product 87%, installation 7%, service 5% and legacy electricity 1% (10-Q). Service is a long maintenance contract on each installed server.

Who pays. Large buyers often do not pay directly: Brookfield's funds own the power projects and buy the servers (a $5B framework in August 2025, raised to $25B in June 2026, management, Q2 2026 call); those Brookfield joint ventures, a related party, were 26% of Q3 2026 revenue, and one other customer was 43% (10-Q note 1). Nebius's New Jersey site is financed by Oaktree, MUFG and Morgan Stanley (management, Q2 2026 call). So Bloom's customers' ability to raise project money is part of Bloom's demand.

Who the end customers are (management unless noted): Oracle (an agreement for up to 2.8 GW, 1.2 GW contracted, April 2026, press; Project Jupiter in New Mexico, up to 2.45 GW, Q1 2026 call); AEP, a utility, which agreed in November 2024 to buy up to 1 GW (10-K), exercised a further 900 MW option worth about $2.65B (Reuters via TradingView, press) and is using 700 MW to supply Google in Wyoming with carbon capture (Q3 2026 call); Nebius, 300 MW in New Jersey; Aligned Data Centers, 2 GW in Pennsylvania (September 2026, press). All the large US cloud companies and more than a dozen smaller AI cloud companies have approved Bloom's product (Q2 2026 call).

What limits it. First, factory capacity: Bloom planned 2 GW a year by the end of 2026 (10-K), its buildings can hold more than 5 GW, and it has leased more space in Fremont (10-Q). Second, gas supply and permits at each site: Oracle sent a force majeure notice on Jupiter in September 2026 after a gas pipeline slipped (Bloomberg via TradingView, press), then named Bloom primary power in an El Paso Electric agreement (press). New York and other places have proposed moratoriums on data centres (10-Q risk factors). Third, competition once turbines and the grid catch up: Bloom sells speed, and speed is worth less when the queue is short.

The AI thesis in plain words. AI data centres need gigawatts now; the grid adds them over five to ten years and turbine makers are booked for years, so on-site power that arrives in months is worth a premium. Bloom is the only fuel-cell maker shipping at that scale, so it captures most of that premium for as long as the shortage lasts. Our central case assumes the shortage holds price through 2029 and fades after. The thesis is wrong if any of these happens: the large cloud companies cut capital spending; turbine lead times fall to about two years before 2030, or the grid speeds up interconnection; Bloom's price per kilowatt falls more than 5% a year; or its large projects slip for gas or permits, as Jupiter has threatened.

2. The Q3 2026 results against the bar

We read the release, slides, 10-Q and the whole call, prepared remarks and Q&A (assumptions.md lists what was read and how far). The five things that matter:

  1. Growth beat Bloom's own outlook again. Revenue $1,235.8M (+138%), product $1,073.6M (+179%) (10-Q). The 2026 guide rose to $4.4-4.6B, its third raise this year; each raise lifted what was left of the year by 16% to 45% (preview.txt). In 2025 Bloom held its $1.65-1.85B guide through July and delivered $2,024M (releases).
  2. Margins rose with scale. Product GAAP gross margin 37.9% against 35% a year earlier; non-GAAP operating margin 23.1% against 8.9%, as operating cost grew 26% on revenue up 138% (10-Q, CFO on the call). GAAP operating income $225.4M (18.2%), GAAP diluted EPS $0.78, non-GAAP $0.94 (release). Service gross margin 17.8% GAAP. Management says pricing "remains strong" (CFO).
  3. Cash went out in the quarter. Operating cash flow was -$27.1M and capex $153.5M, so free cash flow was about -$181M; nine-month operating cash flow is +$272.9M against $231M of capex (10-Q). Contract assets ($858.6M) and inventory ($927.7M) carry the growth; the CFO says contract assets bill on milestones and turn to cash. Cash is $2.49B, against $2.5B of 0% convertible notes due November 2030.
  4. Backlog: no number, but commitments say a lot. Management says backlog "is continuing to expand faster than our revenue" and will give the number with the 2027 guide in February. Bloom has committed to $5.8B of purchases under long-term supply agreements, $2.6B of it in 2027 (10-Q note 12), about 1.4 times what 2026's product costs imply for materials (our assumption of a 75% materials share). Firm unsatisfied obligations for product and installation are $661M, up from $394M at December (10-Q note 3). At end-2025 product backlog was about $6B, up about 2.5 times, and total backlog about $20B (Q4 2025 release).
  5. Concentration and the AI pipeline. Two customers were 43% and 26% of the quarter, and 97% of revenue was in the US (10-Q). New this quarter (management): AEP's 700 MW for Google with carbon capture; first units shipping to Texas; the first block of Nebius's 300 MW ready; a US Army project; utilities buying in front of the meter. The CEO says the 5 GW milestone is coming into view and Bloom is preparing beyond it, adding capacity "in an analog dial", not in steps.

3. Our forecast and value

Alpha, our quantitative model, ranked Bloom 22nd of 702 on 2026-10-22 (score 97.0, tier Strong: growth A, expectations A, momentum B, quality B, valuation E). It ranks on growth, expectations and momentum; this report values the business, and the two disagree here.

The model (model.py, output.txt) builds product revenue from volume times price, and product cost from volume times unit cost, so the margin is a result. Inputs and sources are in assumptions.md (the blind record; section 9 lists the one input changed since); the main ones:

2026 2027 2028 2029 2030 2031
Volume (GW) 1.33 2.00 2.70 3.29 3.79 4.19
Price ($/kW) 2,950 2,950 2,950 2,950 2,862 2,776
Revenue ($M) 4,500 6,604 8,925 10,970 12,398 13,499
Product gross margin 37.0% 38.6% 39.5% 41.3% 41.3% 41.3%
Operating margin after stock pay 17.4% 22.3% 24.8% 27.2% 27.1% 26.7%
Free cash flow, modelled full year ($M) 309 328 1,016 1,690 2,140 2,536

2026 free cash flow is the model's full year; the value counts only Q4 ($130M, our assumption), since cash at 2026-09-30 is counted at face. Reported nine months plus that Q4 would be $172M.

Where we differ from management and history. 2026 is management's guide midpoint; 2027's +47% revenue is our assumption, backed by the 2027 purchase commitments. The 2026 Q4 in the model is the guide's $1.45B, while our preview below expects $1.70B: a beat in Q4 2026 barely moves the value, because 2026 enters only through Q4 cash. The product margin of 41.3% from 2029 is 3.4 points above Q3 2026's 37.9%, because unit cost falls 1.5-3% a year while price is held to 2029. The operating margin of about 27% after stock pay is above anything Bloom has reported (18.2% GAAP in Q3 2026); it comes from operating cost growing about half as fast as revenue, as it did this year. We read it as scale, not a peak, but it is above any year Bloom has reported; the dated support is GE Vernova's sold-out position through 2030 and the CFO's 2026-10-22 remarks that pricing is strong and cost programs are still reaching cost of goods. Ending 2031 at Q3 2026's levels instead (product margin 37.9%, non-GAAP operating margin 23.1%; ours are 41.3% and 29.6%) gives $98, $38 less; the product margin alone is $14 (c6.py, c6.txt).

Stock pay ($234M in 2026) is charged as a cost, and the share count is today's 310.9M diluted shares; the 2030 notes add 12.8M shares only in the optimistic case, whose exit price clears the $195 conversion price, and are repaid in cash in the other two. Tax is 23% on operating profit; the $1.45B of federal losses left after 2026 is worth $352M today with the research credits, counted once.

The exit. At the end of 2031 the central's long fade is worth 15.9 times 2032 operating profit after tax, about 13.2 times 2031 pre-tax operating profit, and the outside view 20.1 times operating profit (the median of Caterpillar, Cummins, Generac, Vertiv and Eaton at their year-ends; GE Vernova has too few years). Their mean, after the $2.5B notes, is $185 a share. We used the method's default throughout, with no changes. The two halves differ by 55% ($225 against $145 at the exit): the fade lets growth glide from 8% to 3% and returns from today's high level to 25%; the peers' year-end multiples include the recent re-rating of power equipment on AI demand (our inference). A terminal growth near 6.8% instead of 3% would close the gap (model auditor, on the blind model). Each half is a fair reading; the method averages them.

Cases. Pessimistic ($31): the data-centre build slows and turbines catch up from 2029; volume 1.75 GW in 2027, falling in 2028 and growing 6% after; price falls 3% to 8% a year from 2028; 2031 revenue $5.8B at an 11.7% operating margin. This is the bust we cannot date. Optimistic ($303): Bloom keeps its time-to-power lead and ships 7 GW in 2031; revenue $22.9B at a 33.9% margin.

Sensitivities (central, output.txt): volume growth 2028-31 ±10 points a year -$48 / +$58; 2027 volume 1.75 / 2.30 GW -$23 / +$25; price 2029-31 -3 / +2 points a year -$36 / +$23; unit cost ±2 points a year -$27 / +$23; operating cost ±5 points a year -$13 / +$9; growth after 2031 4% / 12% -$9 / +$9; Bloom's own beta (Blume 2.86) instead of the peers' 1.27 -$48, to $89.

4. Market expectations and how the price reacted

Bloom closed at $217.77 on 2026-10-22 before the release and traded at $211.27 after hours, about 3% lower, despite the revenue beat and the raised guide (Robinhood). The Street's average target is $296, $267 when brought back one year at our cost of equity (FMP, 2026-10-22).

To see what the price expects, we ran the Street's consensus for each year 2027-2030 through our own model (street_path.py, street_path.txt; FMP consensus via research-check, 2026-10-22). The Street stops at 2030, so 2031 either keeps our growth or carries the Street's 2030 growth on:

Step Value a share
Our central $137
The Street's revenue each year ($6.9B in 2027 to $15.6B in 2030), our unit costs $181 (+$44)
Plus the Street's EPS each year, read untaxed as Bloom's own non-GAAP EPS is $154 (-$27)
Same, read taxed at our 23% $204 (+$24)
Untaxed or taxed, with 2031 carrying the Street's 2030 growth on $164 or $219

Bloom's non-GAAP EPS carries almost no tax while its losses last (Q3 2026 adjusted net profit $302.8M against non-GAAP operating income $285.7M, release), so the untaxed reading is the closer match for the next two years; we did not see the Street's models (inference). Either way the volume step is the largest, and on the untaxed reading the Street's margins are below ours. The price, and more so the targets, then need growth well past 2030 or an exit multiple far above the peers' 20.1x: the model auditor found the discounted target needs about 32x operating profit on the Street's path (blind model).

5. Where we differ from the market

We agree with the market that Bloom is a real winner of the AI power shortage. We differ on how big and how long. Our central triples volume by 2031 and holds price to 2029; the price needs about 6.4 GW in 2031, or the Street's revenue plus a higher exit multiple than power equipment has carried. The difference from the Street's revenue alone is $44 a share; the rest is duration.

What settles it: the 2027 guide and year-end backlog on about 2027-02-04 (a guide midpoint above $6.6B points to the Street's revenue), Bloom's capacity plan past 5 GW, and the product margin through 2027 (holding above 41% with rising volume says the premium is lasting). If volume heads to 6 GW by 2030, our optimistic world ($303) is the better description and we would revise.

6. Why the other side could be right

Bulls. Bloom has beaten its own outlook every time for two years, by 16% to 54% of the remaining period; our central's 2027 (+47%) may be low. The CEO is preparing beyond 5 GW, and customers such as Oracle, AEP and Aligned have each signed for gigawatts; if half of that converts, our optimistic case (7 GW in 2031) is in reach. Data-centre power may stay short for a decade, and carbon capture and 800-volt direct current could open markets we give nothing for. The optimistic path is worth $303.

Bears. One customer was 43% of the quarter and Brookfield's funds 26%: the business is a handful of AI projects financed by others. Q3 burned cash and contract assets are large; the short seller Hunterbrook challenged Bloom's scandium supply and accounting in July 2026 (Bloom rejected it, 8-K 2026-07-09), and a securities class action followed. Oracle has already signalled it may defer payments on Jupiter. Turbine makers are adding capacity, and if the queue shortens Bloom's price premium goes with it. Our pessimistic case, $31, is cash plus a business whose profits shrink after 2028.

7. Next results: Q4 2026, tentatively 2027-02-04 (not confirmed by the company)

From preview.py (preview.txt), written before the market pass. Bloom guides only the full year, so Q4 is the guide less the first nine months.

Forecast Central 80% range Reason
Revenue ($B) 1.70 1.35-1.96 guide-implied $1.45B lifted by half Bloom's median surprise of 35%
Diluted EPS ($, non-GAAP) 1.37 1.04-1.61 Q3's $0.94 plus 30% of the added revenue
Product gross margin (GAAP) 38.0% 36.0-40.0% Q3 37.9%, nine months 36.5%
Operating cash flow ($M) 250 -100 to 600 contract assets turning to cash, as the CFO said
2027 revenue guide midpoint ($B) 5.6 4.8-6.6 our 2027 $6.6B less Bloom's habit of a low first guide
Product backlog at year-end ($B) 11 8-16 about $6B a year earlier, growing faster than revenue

The 2027 guide matters most. Each extra 0.1 GW of 2027 volume (about $300M of revenue) is worth about $9 a share in the model, so a 2027 outcome $1B of revenue above our $6.6B is worth about $28 a share (our inference from the 2027 volume sensitivity).

8. Dates to watch, and what would change the view

  • 2027-02-04 (tentative): Q4 2026 results, the 2027 guide and the year-end backlog. A 2027 guide midpoint above about $6.6B, or backlog above $16B, moves us toward the optimistic case.
  • Oracle's Project Jupiter, through 2027. A formal delay past 2028 or a cancelled order moves us toward the pessimistic case (2027 at 1.75 GW, -$23).
  • The large cloud companies' 2027 capital spending guides (late January to early February 2027). A cut is the pessimistic world.
  • Turbine lead times. GE Vernova's and Siemens Energy's order books and slot dates; a return to two-year deliveries before 2030 means price falls sooner than our central.
  • Bloom's price per kilowatt and product margin. Product GAAP margin below 33% for a full year says price is falling faster than cost; above 41% says the premium is lasting.

9. What changed from the blind value, and the review

The blind model (commit 06116d2) gave $124. Two changes since, both made after the price was known, take it to $137:

Change Evidence, dated and independent of the price Before After Effect
Upkeep capex at least covers depreciation The odds simulation drew shrinking worlds where the model's depreciation, which never retires assets, made net investment negative and the method refused to value them (alpha research odds, 2026-10-22) central $124.10, pessimistic $31.35 $124.10, $31.07 central $0; pessimistic -$0.28
Price per kilowatt held through 2029, cuts from 2030 instead of 2029 GE Vernova, 2026-07-22 Q2 call (company transcript, primary, read for this point): "mostly sold out through '30" and more than half of its 2031 slots sold by the end of 2026. Found by the opposite-side reviewer; we read the transcript ourselves price path 0, 0, -3%, -3%, -3% 0, 0, 0, -3%, -3% central +$12.56, to $136.66; exit $166 to $185

The second change moves the value toward the price. We made it because our blind reason for the 2029 cut was turbine supply catching up, and the largest turbine maker's own dated statement puts that a year later. The pessimistic world keeps its undated bust from 2028.

Reviews. research-eval was run by us (the analyst) on commit 3e8b88304; the two outside reviewers were Codex (codex exec, reasoning effort xhigh, read-only), a model auditor and an opposite-side advocate, on the same commit, which carried the $124 model. Their dollar figures below are on that model. Both ran their scripts in memory: the read-only sandbox refused to save them, so their figures are not rerunnable from saved files; the advocate's source is in its review, and we reproduced the GE Vernova fact and the Street fit ourselves.

Finding From Effect Answer
Turbine supply is sold out through 2030, so the 2029 price cut is early advocate +$12.56 Fixed (table above)
Our Street fit used only 2027 and 2030 endpoints and stretched both improvements into 2031 (flag 17) auditor, advocate $228 overstated; exact years give $204 (auditor) to $222 (advocate) Fixed: street_path.py now fits every year and shows both tax readings (section 4)
Street EPS read as taxed; the non-GAAP definition and interest are unclear auditor -$9.70 on the Street path Fixed: the untaxed reading is now shown and is the closer match to Bloom's own non-GAAP EPS
"12.2x pre-tax" for the fade omitted the next year's growth advocate none Fixed: about 13.2x
A Buy world: volume 12 points a year faster and flat prices after 2028 gives $243 advocate n/a Disclosed: it is close to our optimistic world (6.1 GW and a 44.8% product margin in 2031); it needs both a larger factory than Bloom has committed to and no price give-back, and at Bloom's own beta it is $154
The single flip: volume growth 16 points a year faster (13 after our fix) advocate n/a Agreed; in the Price needs line
Margins end above anything Bloom has reported (research-eval C6) research-eval -$38 if 2031 ends at Q3 2026's margins; -$14 for product margin alone Disclosed (section 3), not changed: the scale argument and GE Vernova's sold-out position are dated support
Working capital stops growing in the fade auditor -$2.09 Disclosed: a method-wide property, raised in process.md
The 2030 notes are repaid at the valuation exit, not their November 2030 maturity auditor -$0.57 Disclosed
Research credits ($47.9M) are not recognised as deferred tax assets; losses valued at once, not when used auditor -$0.15 and -$0.07 Disclosed
Options counted without exercise proceeds; basic shares from the quarter-end, not the cover; finance leases omitted auditor +$0.25, -$0.05, -$0.02 Disclosed; together with the rows above about -$2.7, under 2%
Unvested awards in the share count may overlap with future stock pay auditor +$0.78 if so Rejected for now: not established; future stock pay is a share of future operating cost, not today's awards
Payouts at mid-year rather than year-end auditor -$0.81 at year-end Disclosed: the method's convention
The Oracle warrant asset's amortisation has no explicit schedule auditor not sized Disclosed: it sits in the margins
Q4 2026 is $1.45B in the model and $1.70B in the preview; the 2026 free cash flow row differs from reported nine months plus Q4 advocate none on value Fixed: labelled in section 3
Flags 3, 4, 17 (research-check) both 3: no double charge found by either reviewer; 4: the gap is the fade's growth path against the peers' multiple (section 3); 17: section 4

Not checked: neither reviewer reran the odds simulation; no technical-analysis read was done.

10. Sources

Primary, in data/, fetched from EDGAR 2026-10-22/23: Q3 2026 earnings release and supplemental slides (8-K 2026-10-22), Q3 2026 10-Q, Q2 2026 release, slides and 10-Q, Q1 2026 release, Q4 2025 release, 10-K 2025, Q3 2025 10-Q, releases for Q4 2024 and Q1-Q3 2025, and 8-Ks of 2025-10-30, 2025-11-04, 2025-12-19, 2026-04-13, 2026-04-27 and 2026-07-09. Secondhand: call transcripts for Q4 2025 to Q3 2026 (Quartr via TradingView). Press: TradingView news on AEP, Oracle, Aligned, Hitachi and Hunterbrook (to 2026-10-22). Data: FMP statements, peer betas and year-end multiples (2026-10-22). Method: case-exit-2026-10-22 (src/alpha/services/analyst/research_report/method.py), unchanged.

Details

Report date
Oct 22, 2026
Price source
Robinhood, official close 2026-10-22 (SIP listing-exchange close); after the Q3 release it traded at $211.27 after hours (Robinhood, 2026-10-23 02:20 UTC), Oct 22, 2026, 1:00 PM PDT
Bear / bull
$27.38 / $365
Exit price
$185 (on Dec 31, 2031)
Confidence
15%
Price against our scenarios
The price is justified in 20-50% of our scenarios4,000 simulated outcomes, each drawing the uncertain drivers from ranges we chose: our judgement, not a measured chance
Worlds
3 stories about the businessEach outcome first picks one of these stories by its weight, then draws that story's own driver ranges; the answer above is their mix.
World: base (50%)
the base drivers. The price is justified in under 20% of its scenarios; middle outcome $128, 10th to 90th $64.99 to $257Weight: Our judgment, matching the central case's 50% weight.
World: bear_lean (25%)
AI data-centre build slows and gas turbines and engines catch up from 2029. The price is justified in under 20% of its scenarios; middle outcome $21.20, 10th to 90th $7.74 to $40.69Weight: Our judgment, matching the pessimistic case's 25% weight.
World: bull_lean (25%)
Bloom keeps its time-to-power lead and scales past 5 GW by 2030. The price is justified in over 50% of its scenarios; middle outcome $279, 10th to 90th $155 to $523Weight: Our judgment, matching the optimistic case's 25% weight.
What moves the answer
Volume growth 2028-2031, points a year above or below the central path (35%, 22%, 15%, 10.5%) 55%; Price per kilowatt 2029-2031, points a year beyond the central path (flat to 2029, then -3% a year) 50%; 2027 Energy Server volume recognised, gigawatts 49%; NOPAT growth in the year after 2031 43%; Mature return on new fixed and intangible capital 24%How much of the spread in value each driver explains on its own; drivers that move together share credit, so the shares need not add to 100%.
Leaning cases
2 other views we ranThe same simulation with some ranges moved to another view, to show how much the answer depends on our ranges.
Case: bear_lean
AI data-centre build slows and gas turbines and engines catch up from 2029. The price is justified in under 20% of this case's scenarios; middle outcome $21.20, 10th to 90th $7.74 to $40.69
Case: bull_lean
Bloom keeps its time-to-power lead and scales past 5 GW by 2030. The price is justified in over 50% of this case's scenarios; middle outcome $279, 10th to 90th $155 to $523
Cost of equity (original)
10.6%
Original figures
fair value $137 (bear $31, bull $303), exit $185; Avoid
Street
average $296, median $303, low $176, high $351; 16 targets in the last quarter; FMP price-target-consensus, Oct 22, 2026, 7:40 PM PDT
Restated
Oct 26, 2026, method case-spread-2026-10-24; forecast.json valued by method.py at market inputs 2026-10-01
Cost of equity calibration
+0.0 points
Calibration source
none: the 1-point cut set 2026-10-16 to pull the batch toward the Street was removed on 2026-10-18 (Dong); the cost of equity is risk-free plus beta times the premium
View rule
strong buy when the price is at or below 0.80x fair value; buy when at or below 0.90x fair value; avoid when fair value is below 0.85x the price; otherwise hold
Blind step
Partly unblinded; the model was committed in 06116d2 before the record
Method
As of Oct 22, 2026, built without: Mature return holds own capital

Original call, Oct 22, 2026 (before the Oct 26, 2026 restatement)

We rate Bloom Energy an Avoid: at $217.77 the price is 59% above our fair value of $137 a share (pessimistic $31, optimistic $303). Bloom is a real and now profitable AI power supplier: Q3 2026 revenue rose 138% and it raised its 2026 guide for the third time, to $4.4-4.6B. Our central already has volume tripling to 4.2 GW and revenue reaching $13.5B in 2031 at about a 27% operating margin, holding price until turbines catch up in 2030. The price needs the Street's path: revenue near $15.6B in 2030 and product margins near 45%, or volume growth 13 points a year faster than ours.

BE — Bloom Energy Corporation — research view (market: Avoid)
As of 2026-10-22 · partly unblinded: the brief gave the 2026-10-22 close and a Street EPS
estimate, and contract headlines showed price targets, before the blind commit
(assumptions.md lists seven exposures). Blind commit 06116d2; the blind value was $124,
review moved it to $137 (section 9).

Fair value today      $137 per diluted share, discounting at a 10.64% cost of equity.
                      Weighting the pessimistic, central and optimistic cases 25/50/25 (our
                      weights, not calibrated) gives $152.
Price                 $217.77, Robinhood, official close 2026-10-22 (SIP)  →  fair value is
                      37% below the price. After the Q3 release it traded at $211.27 after
                      hours (Robinhood, 2026-10-23 02:20 UTC).
Five-year exit price  $185 a share on 2031-12-31: the average of two estimates, one from
                      letting Bloom's returns fade toward its cost of capital ($145) and one
                      from what makers of turbines, engines and electrical gear have traded at
                      ($225, at 20.1x operating profit). Fading over 10 or 20 years instead
                      gives $179 or $191.
Five-year return      0.2% a year from $217.77 to the central exit, cash paid out included,
                      against a 10.64% cost of equity
Bear / bull today     $31 / $303: our pessimistic and optimistic cases, each one consistent
                      business outcome.
Confidence            About 15%: our judgment of the share of simulated values within 20% of
                      $137 (interpolated from the simulation's percentiles in odds.json;
                      subjective, not calibrated)
Moat                  Our judgment: narrow and time-limited. Bloom is close to the only
                      fuel-cell supplier data centres use at scale ("very high 90s" share of
                      fuel cells, management), and it can deliver power in months where the
                      grid and gas turbines take years. The lead is speed and a proven
                      factory, not a lock-in: it lasts as long as the power shortage does.
Market expects        More volume than ours for longer. The Street's revenue each year to 2030
                      ($15.6B in 2030; ours $12.4B) is worth $181 in our model; its EPS adds
                      little once read on Bloom's untaxed non-GAAP basis. The rest of the price
                      needs growth past 2031 or an exit multiple above the peers' 20.1x
                      (street_path.txt)
Price needs           Volume growth in 2028-31 13 points a year faster than our central, alone
                      (6.4 GW in 2031 against our 4.2 GW); no other single driver reaches the
                      price inside its range (odds.json)
Odds in our scenarios P(price justified): 20-50%, the share of our simulated scenarios in which
                      the value is at or above the price. Eight in ten simulated values fall
                      between $18 and $345. Subjective, not calibrated (odds.json)
Key driver            Volume growth after 2027: 10 points a year slower or faster in 2028-31 is
                      -$48 / +$58 a share. Then price per kilowatt in 2029-31: 3 points a year
                      lower is -$36; and unit cost, 2 points a year either way, is about ±$25.
Street                Average 12-month target $296 (median $303, range $176-351); 64 targets
                      over the last year averaged $210, the last quarter's 16 $264 and the last
                      month's 6 $281 (FMP via research-check, 2026-10-22). An expectations
                      reference, not validation
Price and trend
Price$203.92
1M-29.4%
3M+22.2%
6M-13.1%
52w position46.5%
From high-41.9%
Relative volume1.4x
As ofOct 26, 2026
Above 21d: noAbove 50d: noAbove 200d: no50d over 200d: yes
Back to the Meridian rank