The question behind the sell-off
In the week to October 15, hedge funds sold technology stocks faster than at any time in at least a decade. 1 CoreWeave's bonds trade like distressed debt, and insuring Oracle's debt now costs what the market charges junk-rated companies. 2,3 Yet the people running the build say they cannot build fast enough. Amazon's Andy Jassy says that even after about $220B of capex this year, his capacity is sold out for 2026, largely sold out for 2027 and partly sold for 2028. 4 "This is not like fiber, it's not dark," says Google's Sundar Pichai. "We are using it." 5
Both sides are right, and that is the puzzle. The demand is real. What may not be real is the money at the edge of the build: the borrowers who built ahead of demand, and OpenAI's promise to pay for compute it has already ordered. The bubble debate runs three questions together, and we take them apart. Can the builders pay their bills? Will the build earn its return? Will the stocks pay from today's prices? The cash-rich core can pay. Whether the build earns its return is not yet settled. The debt-funded edge has already broken. For a portfolio, that means keeping market exposure but cutting how much of it rides on AI.
The bears have serious company. Meta has told investors it may need to "raise hundreds of billions of dollars". 7 The most-read bear piece of the month, from TS Lombard, imagines the AI boom ending in early 2028 with the S&P 500 down 30%. 8 So the question for an investor is not whether AI is real; it plainly is. The question is whether the money behind the build runs out before the revenue arrives, and how much of that risk the chip sell-off has already priced.
We answer in three steps. First, is it a bubble? We set out the bear and bull cases as their best advocates make them and test both against the money. We then follow the money to its weakest link, OpenAI, and check whether the biggest buyers will keep spending in 2027. Second, how far could prices fall from here, with chip stocks already deep in a sell-off? Third, what should an investor do?
The bear case
The bears are right about the mechanics. Vendor financing, debt kept off balance sheets and two labs carrying most of the revenue are all real and measurable, and at the debt-funded edge the damage has started. Where the numbers do not back them is the timing: chip rents are rising, not falling.
Dario Perkins: a bubble that ends in a balance-sheet bust
TS Lombard's "Perkini Report" is written as a post-mortem from 2030. 8 Perkins calls it a scenario, not a prediction. Its five fault lines are the most complete version of the bear case we have read:
- Capex recycling. One company's capex is another's earnings, so the more the hyperscalers (Microsoft, Alphabet, Amazon and Meta, the biggest buyers of AI capacity) spend, the better AI revenue looks. Revenue inside the loop proves nothing; what matters is whether people outside it pay. That is the test we apply in the section on outside money.
- Vendor financing. Suppliers invest in customers who then buy from them. Money leaves as equity and comes back as orders, "with NVIDIA at the centre of everything".
- Off-balance-sheet leverage. Data centres are increasingly built by special-purpose vehicles and leased back, so the debt sits outside the hyperscalers' balance sheets.
- The labs' numbers. OpenAI's and Anthropic's figures arrive through leaks, are unaudited, and lean on annualised run-rates that flatter them.
- Concentration. About $200B of current revenue supports more than $1T of commitments from two companies.
In his story the turn comes when OpenAI's IPO shows audited numbers that do not match the pitch. In January 2028 the hyperscalers cut their 2028 capex guidance by 45%, to about $600B. By April the S&P 500 is down about 30%, AI stocks 40% and the rest of the market 20%. Neoclouds trip their loan covenants and go bankrupt, and a large leveraged cloud provider is cut to junk. The hyperscalers' own credit holds. The recession is mild, more 2001 than 2008, and the Fed cuts hard. His advice is to hold a normal amount of risk with less of the AI complex than the index gives you, add bonds as the cracks show, and not try to be early.
What the numbers say. Most of his fault lines are real, and several can be measured. Take vendor financing first. NVIDIA has guaranteed $108.5B of its customers' obligations, a sum equal to 36% of a year's revenue. Lucent, the telecom equipment maker whose loans to its customers became the textbook case of vendor financing gone wrong, was at 24% in 2000. By size NVIDIA looks worse, though the section on outside money shows its guarantee is narrower than Lucent's loans were. 9,10 Off-balance-sheet leverage is growing too. Meta's signed leases on data centres that have not yet opened, which do not appear as debt, rose from $103.8B to $355.7B in nine months. 11 His concentration figure holds up as well: his $200B of revenue is close to our own count of about $160B a year including Anthropic. On the labs' numbers he has a point, but a smaller one than it first appears. OpenAI says its revenue is running at about $50B a year. The revenue it actually booked in the second quarter, $6.7B, works out to only $27B a year. The section on OpenAI explains why most of that gap is fast growth rather than flattering arithmetic. 12,13
What the numbers do not support is his timing and depth. His turn is more than a year away, and a lot can change before then. His story also needs chip rents to collapse, and today they are rising. That does not refute him. High rents now are exactly what draws in the supply that would land in 2028, and a glut then is what his story needs.
Ed Zitron and Craig Moffett: too little revenue, at falling prices
Ed Zitron, a newsletter writer and the most prominent AI bear, argues that almost all AI revenue is two labs, OpenAI and Anthropic, paying the clouds for computing power. If he is right, the clouds' AI growth is not evidence of broad demand. It is money from the labs' investors passing through. He says brokers put the labs at 73% of Amazon's AI revenue and 70% or more of Microsoft's. We could not find those figures in the brokers' own reports, so we treat them as his. He also adds up more than $1.35T of lease and purchase commitments at four hyperscalers that do not appear on their balance sheets. 14,15 Craig Moffett, interviewed on Stratechery, adds a second problem: deflation. Most work does not need the best model, so customers move to cheaper ones, and the price of AI falls faster than its use grows. In that world revenue can shrink even while usage booms. 16
What the numbers say. For Microsoft, the labs' weight is confirmed by its own figures: it booked $24.1B of revenue from OpenAI in fiscal 2026. 17 For Amazon, the labs' share is not disclosed, and we could not confirm the estimates he relays. Either way, counting the labs' payments to the clouds as demand would count the labs twice. So when we count revenue below, we include only cloud AI revenue that does not come from the labs. Moffett is right that the price of a unit of AI is collapsing. Epoch AI, a research group, estimates that the cost of reaching a given level of capability falls about 13-fold each year. Token prices, the price per unit of text a model reads or writes, fell 43% in ten weeks this summer. 18,19 Usage is rising fast too: the number of tokens Google processes each month rose 6.7-fold in a year. 20 These figures cannot tell us whether revenue is outgrowing the price fall, because they cover different products and periods. But one test does not need that comparison. In an overbuilt market, the rent for computing capacity should fall. Instead, the price of one-year rental contracts for NVIDIA's H100 chip rose 38% from October 2025 to March 2026. 21
Chamath Palihapitiya: the payoff is slow and lopsided
In September, Palihapitiya argued that AI pays off only for firms that first redesign how their work is done, and that most firms instead bolt it onto old processes and see little gain. 22 The evidence he leans on holds up. In a field trial with 515 start-ups, the firms that were shown how others had reorganised around AI went on to earn 1.9 times the revenue of firms that were not. Almost all of that gain came from the top tenth of firms. 23 The economy-wide numbers show no boom yet either. US output per hour worked has grown 2.06% a year since 2019, against 3.30% a year in 1995–2003, when the last technology wave was paying off. 24 And Ramp, which tracks business card spending, finds that 55.9% of businesses paid for AI in September, but that share is rising more slowly each month. 25
This is the bear point we weigh most, because it is about timing. In 1987 the economist Robert Solow complained that you could see the computer age everywhere except in the productivity statistics. Productivity did pick up, but only about eight years later. If AI runs on a similar lag, buyers' gains arrive after the bill for the build falls due, and whoever financed the build has to carry it in the meantime.
Lenders put CoreWeave's default near a coin flip
Lenders sit closest to the edge, and this month they were the loudest bears. On the All-In podcast, the hosts looked at CoreWeave's credit default swaps, the price of insuring its debt against default. At about 953bp, or 9.53% of the debt's value a year, they read that price as roughly a 55% chance of default within five years: in their words, "a coin flip". The reading assumes lenders get back the standard 40% in a default, and it is what the insurance market charges, not a forecast. They also noted that three customers make up about 75% of CoreWeave's revenue, and that it needs to raise roughly as much debt again as the $35B it already owes. 26
On the Monetary Matters podcast, its host Jack Farley estimated that about $500B of next year's AI capex will have to be borrowed, through bonds, private credit, special-purpose vehicles and debt backed by the chips themselves. Because the same build-out stands behind all of it, he argued, defaults could become "extremely correlated" within 18 to 36 months. Jim Bianco of Bianco Research, a bond-market strategist, agreed that was the risk. 27 And CoreWeave's ordinary bonds rank behind the private-credit vehicles that own its GPUs (the chips that run AI models), so in a default its bondholders would be paid last. 28
The same week brought evidence for Moffett's deflation point from the buyers themselves. Meta told investors it expects its AI to become ten times more cost-efficient within a year. If that happens, Meta can do the same work with far less compute. 29 On the 20VC podcast, Jason Lemkin, founder of the software community SaaStr, noted that Replit, a coding start-up, had switched its default model to OpenAI's because it gave similar quality at 30–40% lower cost. His warning was that there is "only so much R in the ARR": annual recurring revenue is only as recurring as customers' loyalty, and customers switch on price. 30 Anthropic's quarterly revenue growth slowed from 147% in Q2 to 45% in Q3, on the reported figures. 28 On his Plain English podcast, the writer Derek Thompson pointed out that outside the chip and memory makers there is little visible return yet, and that only about 3% of people pay for AI themselves. 31 Even Satya Nadella describes Microsoft's strategy as building to meet current demand and deliberately spending less than it could at the frontier. 32
Ken Griffin and Freda Duan: the depreciation bill and the airline problem
Two of the most-shared bear arguments on X this week were about cost. 33 Freda Duan of Altimeter Capital put 2027 AI infrastructure spending at roughly $2.5–3.0T for about 50 GW of capacity. Chips and buildings wear out, and their cost is charged against profits over their working lives as depreciation. On her numbers, that spending implies $400–480B a year of depreciation. Against it, rumours put the labs' revenue near $200B a year by the end of 2026. She thinks the labs need something closer to $400B by the end of 2027 for the sums to work. Asked whether the return was ever a slam dunk, her answer was "Never, really." 34 Ken Griffin, who runs Citadel, compared GPUs to airline seats. Once the plane is flying, an extra passenger costs almost nothing to carry, so when there are more seats than travellers, fares collapse. Fibre-optic bandwidth went the same way after 2000. He also questioned whether GPUs stay useful as long as their owners' depreciation schedules assume. If they wear out sooner, today's profits are overstated. 35 And Brad Gerstner of Altimeter, a prominent AI bull, sold $650M of CoreWeave shares a month ago, reportedly because lenders will no longer make cheap loans secured only on GPUs. 36
The market is already treating capex as a cost rather than a promise of future profit. Meta beat analysts' estimates last week and raised the bottom of its 2026 capex range (the section on the biggest buyers has the numbers). Its shares fell 9.4% on the week. Investors marked the stock down for spending more. 37,38
The builders are already breaking
At the debt-funded edge, the bear case is already happening. Oracle is the clearest case. Its five-year credit default swap, the yearly price of insuring its debt, was about 295bp on October 19 after touching 300bp, a level usually seen on junk-rated companies. It sold $20B of new stock last quarter to help pay for the build. Its net debt is 3.2 times its EBITDA (earnings before interest, tax, depreciation and amortisation, a rough measure of cash profit), and its free cash flow, the cash left after capex, is negative. 39,40,41 CoreWeave is further along. Its bonds due in 2031 and 2032 yield about 15%, the return investors demand when they doubt they will be repaid in full. Its $35.1B of debt equals 34% of all the revenue it has under contract. 42,43 The stress is also spreading beyond AI. The extra yield on the lowest-rated corporate bonds, those rated CCC, has crossed 13 percentage points over Treasuries, a line we set in advance as a warning. 44
The bull case
The people signing the purchase orders say demand exceeds supply, and for 2027 the evidence backs them. Rents are rising, most of 2027's capacity is already under construction or financed, and demand reaches well beyond the two labs. What the bulls concede is that a few firms, many of them funded by the same boom, do most of the paying.
The builders say demand exceeds supply
The bear case is made mostly by commentators and lenders. The bull case is made by the people who sign the purchase orders, with their own money on the line. Jassy says Amazon could spend a good deal more and it would still be a good use of capital. He puts the payback on a server at about three years, against a working life of five to six years and contracts of about five. He also thinks inference, the work of running models for users, is still roughly ten times too expensive for pervasive use. On that view, cheaper tokens bring more demand, not less revenue. 4 Pichai says everyone in the industry is short of compute and wishes they had twice as much. His confidence rests on signed contracts and backlogs: "it's not just hope". He concedes the industry can overbuild, and that Alphabet's free cash flow turned negative this summer for the first time since its IPO. 5,45
The outside forecasters agree on scarcity, for now. SemiAnalysis forecasts about 50 GW of data-centre capacity added in 2027, roughly double the consensus, and says megawatts are now harder to get than GPUs. It names a data-centre oversupply in 2028 as the main risk. 46 On All-In, David Sacks noted that even old H100 and A100 chips rent at a premium, and Ben Horowitz drew the contrast with 1999–2001, when bandwidth fell from about $1,500 to $50 per Mbit: today token prices are falling, but GPU prices are not. 26 And Jim Bianco argued that the CCC blowout is a few problem borrowers rather than a warning for the whole market. In his words, "it's 1997", not the spring of 2000. 27
The physical build backs that up. SemiAnalysis counts more than 24 GW of data centres in an advanced stage of construction across just 40 campuses, most of it due in 2027, and over $1T of binding, non-cancellable leases signed so far in 2026. The leases matter because developers usually spend only 5–10% of a project's capital before a tenant signs; the lease is what lets them borrow the rest. 47 The political backlash is real but small in megawatts. Of more than 300 local moratoriums, SemiAnalysis finds that about 20 GW of planned capacity sits inside a restricted area, but only about 1.5 GW is actually delayed, or about 2.3 GW counting New York's state order. That is against its forecast of 38 GW added in the US in 2027. 48 Most of 2027's capacity is already under construction or financed. If a bust comes, it is more likely a 2028 story.
Not everyone thinks the capacity will arrive that fast; some expect power shortages to push part of the 2027 build into 2028. SemiAnalysis says the power problem has been "broadly solved" by on-site generation. Both views point the same way for 2027: too little capacity rather than too much. They differ on how much of the delayed supply then lands in 2028, which is exactly where the oversupply risk sits.
Demand reaches well beyond the labs
The second leg of the bull case is that demand is broad, not just two labs, and the companies' own reports bear that out. Microsoft has 100,000 customers building on its Foundry AI platform and more than 30M paid seats for Copilot, its AI assistant. Nearly 500 Google Cloud customers each processed more than a trillion tokens last year, and Google Cloud's revenue grew 82%. AWS grew 37%, and its AI business is running above $25B a year. Palantir's US commercial revenue grew 149%, and the coding tool Cursor passed $4B of annualised revenue in June. 50,51,52,53,54,55,56 Advertising, which has nothing to do with the labs, tells the same story. Meta's ad revenue grew 26% in Q3, and Meta credits its AI ranking models with 15.7% more conversions on Facebook: advertisers get more sales for the same spend, and pay Meta for it. 38,57 One caution applies. The cloud growth figures include what the labs pay, so they overstate demand from everyone else. Meta's advertising figures do not have that problem.
Palihapitiya again: value collects at the chokepoints
In May, Palihapitiya laid out the AI stack in six layers: infrastructure, chips, data, models, execution and applications. 58 His argument is that each layer has a few assets everything above it must pass through, and those owners keep the value. The cost of running a model, he notes, has fallen about 1,500× in six years. So the models themselves commoditise, and the money goes to the chokepoints: lithography machines, power, chips and the software that runs them. That is a bull case for the suppliers, and it cuts against our view that they are hit first. We take it seriously, and come back to it in the verdict.
Rents for available chips are rising, though not everywhere
The cleanest test of overbuilding is price. When a market has built too much capacity, the price of renting it falls, and in the telecom bust it fell fast. Internet transit prices, what networks paid to carry each other's traffic, fell 16% in 2000, 40% in 2001 and 50% in 2002. 59 Today the price neoclouds charge to rent an AI chip is rising. Silicon Data's index of their hourly H100 prices rose from $2.00 to $2.88 between December and October. 60 The big clouds' list prices tell a different story: Silicon Data finds their H100 rates fell 26–54% by region between early 2025 and mid-2026, though it notes that its figures cannot separate price cuts from a change in the mix of contracts. 61 The market for future rent has also stopped pricing further rises for older chips. Carmen Li, Silicon Data's founder, says its forward curves sloped upward earlier this year, but those for the A100 and H100 have recently flattened, while the newer B200's still slopes up (Pitch The PM podcast, October 16). One trade report goes further and says the curves now slope down. 62 Oracle reports that 97.9% of its GPUs are in use, and that customers renewing contracts on older GPUs pay a 20% premium. 63 Capacity that can be had now is scarce. That is the clearest difference from 2000, though rents differ by provider and region, and a fully rented chip can still serve a customer who loses money. Part of the scarcity may come from shortages of memory and power rather than from demand alone. Either way, the capacity that exists is being used.
Valuations are high, but not 2000-high
The ten largest companies make up 40.6% of the S&P 500's value, but on every measure in the chart they stand on firmer ground than the top ten of March 2000, and they earn far more. Their earnings are somewhat flattered by gains on stakes in AI labs, such as Alphabet's gain on Anthropic in Q2. 64
The chart here is now drawn in the data section. It showed: Top ten S&P 500 companies: 26.5 times earnings today against 53.6 in March 2000; profit margin 33% against 9.1%; 36.1% of index profits against about 15%.
The biggest spenders also carry little debt. Their combined net debt is about 0.3 times EBITDA as reported, and 0.6–0.8 times if leases and special-purpose vehicles are counted. Oracle, at more than 3 times, is the outlier. 65 Those figures leave out leases signed for buildings not yet finished, which reach the balance sheet only when a site opens. Reuters put them at about $1.09T across Microsoft, Meta, Oracle, Amazon and Alphabet in August; Microsoft's alone reached $329B in June, up from $197B in its previous filing. 66 Paid over the usual 15 to 20 years, that is roughly $55–75B a year, against about $700B of yearly operating cash flow at the five. It is a fixed cost that grows with every lease signed, and it cannot be cut the way capex can, but it is not a debt problem today.
The size of the build is less reassuring. Counting only the buildings, data-centre capex was about 0.8% of US GDP in Q1 2026. 67 Counting the computers as well, Cape Fear Advisors puts AI investment at 1.3% of GDP over the year to June, or 1.5% at the second quarter's pace. That already matches telecom's peak of 1.4% in 2000, though it is below the railways' 3.1% in 1893. 68 So the build is no longer small for the economy. It is about the size of the last bubble's, and still growing. The difference is who pays: mostly companies with far more profit than the telecom builders had.
At today's rents, the build pays
The room to spare is about $3B a gigawatt a year: rents can fall 15% before a cash-funded build stops earning its return. Matt Dratch, replying to Duan on X, showed this with a break-even calculation built from her own numbers. A gigawatt of AI capacity costs about $55B to build. About 30% of that goes on buildings and power equipment that last 25–30 years, so only the rest wears out quickly. The chart sets what a gigawatt brings in today, on Duan's own figures, against what it needs to earn its owners 15% a year. 69
The chart here is now drawn in the data section. It showed: Revenue per gigawatt today is $20B, against break-evens of $17B paid in cash and $13-14B if 80% borrowed; rents a third lower give $13B.
If rents fall by a third, the room is gone and Griffin's airline problem arrives. That is why we watch GPU rents more closely than any other single number. We expect rents to fall as each new chip generation's supply lands, even with the chips still fully used. A sustained fall of more than 15% would use up Dratch's margin. The build does not need rents to stay where they are, but it cannot afford a fall much larger than that.
Anthropic's filing backs its numbers
Anthropic told investors it had positive free cash flow in Q3 and an adjusted operating margin above 11%. 70,71 Its S-1, filed October 26, backs the direction: first-half revenue of $16.3B, an operating profit of $974M in Q2, operating cash flow of +$3.9B and more than 1,900 customers paying over $1M a year. 184 The half-year figures are unaudited interim statements, and this letter was prepared with Anthropic's model (see the disclosure), so we count them only where the filing states them. So far, Perkins's IPO moment is working the other way for this lab.
What the bull case concedes. Three facts cut against the breadth argument. First, Microsoft's backlog of contracted future revenue grew 84% in total but only 25% excluding OpenAI, so most of the growth came from one customer. 50 Second, on Ramp's card data, 80% of what businesses spend with OpenAI and Anthropic comes from 1% of firms. Many firms use AI, but a few do most of the paying. 73 And those few are often funded by the same boom: on Ramp's data, as cited by Tomasz Tunguz, 80% of the largest AI spenders are venture-backed, against 13.1% of the median spender. US venture investment reached $516B in the first nine months of 2026, with 82.7% of it going to AI. 74 Part of what we count as outside money is investors' money passing through start-ups to the labs. Third, Microsoft has not updated its $37B AI revenue run-rate since April. A company with good news usually shares it, so we read the silence as a mild negative. 75
Does outside money pay for the build?
Not yet in full. Outside revenue comes to 69% of the yearly capital cost of what is already built without Anthropic, and 118% with it, before running costs. Paying for the build planned to 2030 needs that revenue to grow 52–73% a year. We put about 45% low confidence, 30–60% on it getting there on time counting Anthropic, and 20% low confidence, 10–30% without. This sizes the gap. It does not measure profit.
Companies are not waiting for the return. In a Gartner survey published October 13, 85% of business leaders expected to raise AI spending, while 13% of CIOs reported impact beyond productivity gains. 76 That is the pattern this section measures: spending runs ahead of the revenue that would pay for it.
The two cases agree on more than they admit. Both say demand is real. They disagree on whether money from outside the AI industry will grow fast enough to pay for what is being built. Moffett put the test well: are "the revenues coming into the system greater than the costs of building the whole value chain"? 16 As one investor summarised his interview on X, "the technology being real & the capex earning its return are 2 different questions." 77 We count that money, line by line, and set it against the cost.
The money loop is real, but smaller than it looks
Suppliers funding their own customers is the heart of the bear case, so it now has its own page: The AI Money Loop, with a section on what each of Anthropic's vendors puts in, risks and gets back. The short version follows.
NVIDIA's guarantees come to $108.5B, or 36% of a year's revenue, against 24% for Lucent in 2000. But $105B of that is one capped guarantee on OpenAI's Ohio leases. It covers only a shortfall, starts from 2028, and OpenAI must pay back anything NVIDIA pays out. Leave it out and NVIDIA's guarantees are 1.2% of revenue, and it has paid out nothing so far. Lucent had already lent cash equal to 6% of a year's revenue to carriers that then failed. 9,10,78
Anthropic's S-1 puts the vendor money in writing. Google, Amazon, Broadcom and AMD have put in or promised about $103B, or $118B if Microsoft's and NVIDIA's reported stakes are added, which is 12 to 15% of a compute bill of roughly $810B. About $77B of it is not yet drawn. The vendors are already well ahead on paper: Amazon's $6.2B of notes are carried at $108.6B. The risk is that everything moves together. If Anthropic's growth slips, the vendors' stake, their revenue from Anthropic and the collateral behind their loans all fall at once. 184 The other big loop is Amazon's $50B in OpenAI's March round, all of it now paid in. 80,81 In its October stability report, as press coverage summarises it, the IMF counted 14 such financings since 2023 and named an AI correction as one of three near-term triggers for market stress. 82
Outside revenue covers two-thirds to all of the capital cost, before running costs
The table counts outside revenue at third-quarter 2026 annual rates. Each input has its own row, so you can swap in your own estimates.
| Outside money, $B a year | Low | Base | High | Basis |
| OpenAI | 27 | 40 | 50 | Q2 revenue of $6.7B × 4 (WSJ); above $40B annualised in August (Bloomberg); close to $50B in September on OpenAI's own net basis (FT) 13,12 |
| Cloud AI from customers other than the labs | 20 | 30 | 40 | AWS about $8.5B, a broker estimate relayed by Zitron that we could not check. The labs' share of AWS's AI revenue is not disclosed, so this row is uncertain in both directions. About 30% of Microsoft's $37B AI run-rate, consistent with the $24.1B it booked from OpenAI. Google $0–20B, undisclosed 75,14,17 |
| Extra ad revenue AI brings Meta and Google | 0 | 23 | 46 | 0%, 25% or 50% of their combined ad growth of about $93B a year. Neither reports the AI share, so this is the widest input 38,53 |
| Total without Anthropic | 47 | 93 | 136 | |
| Anthropic | 67 | 67 | 67 | Q3 revenue of $16.8B × 4, given to investors and reported by Bloomberg and Axios; not yet in a filing, and on a gross basis that may double-count part of the cloud row. The S-1 shows $11.6B for Q2, or $46B a year, and says 48% of first-half revenue came through the clouds 70,184 |
| Total with Anthropic | 114 | 160 | 203 | |
Against that, Microsoft, Alphabet, Amazon, Meta and Oracle spent $1,134.9B of cash capex from January 2023 through June 2026. 41 We turn that into a yearly capital charge: the level yearly payment that would repay the capital over its life and pay a return on it at the cost of capital. Chips are paid off over their working life and buildings over 20 years, each at the cost of capital.
| Yearly cost of the build in service | Bull | Base | Bear |
| Share of capex spent on AI | 70% | 70% | 100% |
| Chips' share of the spend, and their life (buildings last 20 years) | 60%, 7 yrs | 60%, 6 yrs | 60%, 5 yrs |
| Cost of capital | 6% | 8% | 9% |
| Yearly cost | $113B | $135B | $225B |
The chart here is now drawn in the data section. It showed: Coverage of the yearly cost by outside money. Bull: 82 percent without Anthropic, 141 percent with. Base: 69 and 118 percent. Bear: 41 and 71 percent..
Each column uses the base outside-money total. The cost leaves out leases, power, staff and the labs' own running costs, so coverage is overstated; Meta alone has $355.7B of signed leases that have not yet started. 11 The capex figures are compiled from filings by a market-data vendor.
So outside revenue covers between 69% and 118% of the yearly capital charge on the build, depending on Anthropic. Neither end is a measure of profit, for three reasons.
- Revenue is not cash left over. The charge already includes the cost of capital, but revenue must also pay for power, staff and research. As an illustration only, if 60% of the $160B were left after those costs, it would cover about 71% of the charge.
- Some of the payoff has no AI revenue line. Lower costs, better ad conversion and customers kept inside the hyperscalers' own businesses are real returns this count misses, beyond the ad share in the table.
- The cost side is rough. It applies one AI share to five companies' total capex and treats everything spent since 2023 as working capacity, including buildings still under construction and spending on ordinary cloud and warehouses.
We show the count without Anthropic because this letter was written with Anthropic's model and its figures are unaudited, not because its revenue should be ignored. A consistent count would include it, net of what it pays the clouds, and that lands between the two ends.
Each year's spending needs new revenue of about 12% of its cost, every year
The count above takes the whole build at once. The same arithmetic can be run on each year's spending. On the table's base terms, each $100B of capex needs about $12B of revenue a year to repay it and pay the cost of capital. So the test for each year is whether outside revenue grew by that much.
| Year of spending | Capex of the five, $B | Yearly charge it adds, $B |
| 2023 | 154 | 18 |
| 2024 | 239 | 29 |
| 2025 | 412 | 49 |
| 2026, company guidance | about 800 | about 96 |
| 2027, consensus and broker estimates | 1,000–1,200 | 119–143 |
Capex for 2023–2025 is cash capex from filings, compiled by a market-data vendor; Oracle's years are its fiscal years. 2026 uses each company's guidance, which for Microsoft and Meta includes finance leases. 2027 spans MarketScreener's consensus for the four largest and the totals Goldman Sachs and Morgan Stanley published, as reported. The charge uses the base column of the table above. 41,83
Over the past year, the two labs alone added revenue of about twice the 2025 charge. How much customers outside the labs added is not disclosed. OpenAI's run-rate rose about $38B, from $12B in July 2025 to about $50B in September 2026. Anthropic's rose about $60B, from about $7B in October 2025 to $67B, on its own gross basis. 84,12,85,70 So the newest finished year of spending is paying its way on the margin. The test is the next two. The 2026 and 2027 spending need outside revenue to grow by about $100B next year and $120–140B the year after, on top of closing the existing gap. That means the labs repeating their best year and then beating it, or customers outside the labs starting to carry far more of the load.
The 2030 bill needs growth almost no company has managed
That is the build already finished. The build still planned is far larger. J.P. Morgan puts AI capex at $5.5T through 2030. 86 On the same terms as the table, that build would carry a yearly cost of about $950B. For outside revenue to cover it by 2030, 4¼ years from now, the revenue would have to grow 73% a year from today's $93B. Even counting Anthropic's revenue, which starts the count at $160B, it would need to grow 52% a year.
The labs grow that fast today. OpenAI went from about $12B annualised in July 2025 to close to $50B in September 2026, and Anthropic's quarterly revenue rose 45% from Q2 to Q3. 84,12,70 But the labs are only part of the total, and the advertising and cloud lines in the table grow far more slowly. Growth this fast is also rare for companies this large. Of US-listed companies with $20–80B of yearly revenue at some point between 2004 and 2026, only 1.5% went on to grow 30% a year for the next four years. Only one grew 50% a year: NVIDIA, the seller in this same boom. The sample includes only companies still listed today, so it misses the ones that failed. Treat it as a rough frequency, not a probability.
Our judgment is that outside money covers the 2030 bill on time with about 45% odds counting Anthropic's revenue (40% before its S-1), and 20% without it. The likelier outcome is that it gets there late. That is why we expect the strain to show first at the edge, where the bills are fixed and the cash is borrowed.
| Growth next year | Share of that growth rate kept each later year | 2030 bill covered, without Anthropic | with Anthropic |
| 100% | 50% | 42% | 72% |
| 100% | 70% | 70% | 121% |
| 150% | 50% | 72% | 123% |
| 150% | 70% | 142% | 245% |
| 200% | 50% | 113% | 195% |
One company's plan carries most of that gap. As the FT reported it in September, OpenAI's revenue rises from $36B in 2026 to $350B in 2030, a 77% yearly pace. Compute costs $856B over the period against $840B of revenue, and free cash flow is −$278B. The $122B it raised in March runs out by 2028. 87,81 That is where we look next.
Can OpenAI pay for what it has ordered?
Through 2027, yes. After that, not on its own. Cash in hand and the rest of the March round carry OpenAI through 2027, and its revenue is on plan for now. For 2028 it needs an IPO, a new round or new terms with its suppliers. Its executives say the constraint is computing capacity, not customers. So we put only about 25% low confidence, 15–40% on it cutting or pushing back at least $100B of contracts by the end of 2027 because it cannot pay, and 10% or less on a failure to pay. Oracle takes the first hit if it does.
Every path to paying for the build runs through the labs' revenue, and the largest single bet is OpenAI's. It is the biggest customer in Oracle's backlog, a large share of Microsoft's and Amazon's, and the tenant behind NVIDIA's largest guarantee. If one company turns strain at the edge into losses for the core's suppliers, it is OpenAI. So we take its position apart: what it has signed, how it pays, how solid its revenue is, and what companies in its position have done before.
$665B of commitments, almost none on its balance sheet
Start with what OpenAI has promised to buy. Its purchase commitments, almost all of them for computing capacity, were about $665B at March 31, according to The Information's review of its draft IPO financial statements. Against that it had no debt and less than $750M of lease liabilities. 88 A promise to buy compute in future years is not debt under accounting rules, so anyone who reads only OpenAI's balance sheet misses it. It shows up instead as backlog on its suppliers' books, where it counts as their future revenue. Since March OpenAI has added a 20-year lease on a 4.25 GW campus in Ohio, whose value has not been disclosed. 9 The table lists the main contracts.
| Counterparty | Size | Runs | How firm | Changes so far |
| Microsoft Azure | $250B of new commitments from October 2025; about $281B in all on analysts' estimates | to about 2030–32 | Contracted. Since April, OpenAI may also buy from other clouds | Exclusivity loosened in April 2026. Microsoft booked $24.1B of revenue from OpenAI in fiscal 2026 17 |
| Oracle (Stargate, the data-centre programme OpenAI runs with Oracle and SoftBank) | About $300B over about five years, roughly 4.5 GW | from 2027 | Terms not public. $75B of Oracle's AI backlog is reported to be prepaid or to use customer-supplied chips | A 600 MW expansion at Abilene was dropped in March 2026 and the site went to another tenant. Bloomberg reported some sites slipping to 2028; Oracle denied it 89,90,91 |
| AWS | $138B | 7–8 years | Contracted | Grew from $38B to $138B in February 92 |
| CoreWeave | Up to about $22B | to May 2031 | "Up to" amounts | Expanded 93 |
| Cerebras | Over $10B, up to $20B or more by 2030 | to 2030 | Binding master agreement; expansion optional | OpenAI also lent Cerebras $1B 94 |
| Ohio campus (SB Energy as landlord) | Value not disclosed; NVIDIA guarantees the buildings' value up to $105B | 20 years, from NVIDIA's fiscal 2029 | Long lease; OpenAI must repay NVIDIA for anything it pays out | New in August 9 |
OpenAI has also signed headline deals with chip makers: about 12 GW with NVIDIA, 6 GW with AMD and 10 GW with Broadcom. These are mostly the same capacity seen from the other side. The chips go into the cloud data centres and leases in the table, so adding the chip deals to the cloud contracts would count the same compute twice. Some of the chip deals are also softer than their headlines. NVIDIA's $100B letter of intent was never binding and became an equity stake of about $30B. 95 AMD's deal gives OpenAI a warrant, a right to buy AMD shares, that vests only as the capacity is actually deployed. 96 Added together, the cloud contracts come to about $750B. OpenAI's revenue is running at about $50B a year, so it has signed for roughly 15 years of today's revenue.
It has redrawn the plan four times in a year
OpenAI's compute plan was $1.4T in October 2025, $600B in February 2026, about $750B in July and $856B in September. 97,98,87 Those are plans, not contracts, but they show a company that resizes often and in both directions. The one cut to a signed project, Abilene, was absorbed without a loss: the site went to another tenant. 91 In the last three months we found no reported cut or delay to an OpenAI contract.
Funded through 2027, not 2028
Next, how OpenAI pays. It had $73B of cash at the end of March, after burning $3.7B in the first quarter. 99 Its $122B funding round in March brought in Amazon for $50B, and Amazon's filings show all of it has now been paid in. 100 SoftBank, the round's other large investor, paid the last of its $30B on October 1 and has repaid the bridge loan it first used, refinancing it with bonds. S&P rates SoftBank BB+, one notch below investment grade. 101 So the money already raised is in hand. What OpenAI still needs is money for 2028 and after. As for spending, OpenAI's February plan burns $25B of cash in 2026, $57B in 2027 and $85B in 2028. The plan the FT reported in September burns $278B in total through 2030. 97,102
The table sets OpenAI's cash against its own plans, year by year. Cash rose from $40B at the end of 2025 to $73B at the end of March while OpenAI burned $3.7B, so about $37B of the March round had already arrived. That fits Amazon's first $15B and $10B each from SoftBank and NVIDIA. The rest arrived later: Amazon's other $35B, and SoftBank's and NVIDIA's last $20B each. 99,100,101,103 The other investors' money, about $12B, is left out, which makes the gap a little larger than it may be.
| OpenAI's cash, $B | February plan | September plan |
| Cash and securities, March 31, 2026 | 73 | 73 |
| Rest of the March round, paid in since | +75 | +75 |
| Burn, April to December 2026 | −21 | −274 over April 2026 to 2030; yearly split not reported |
| Burn, 2027 | −57 |
| Cash at the end of 2027 | 70 | — |
| Burn, 2028 | −85 | |
| Cash at the end of 2028 | −15 | — |
| Burn 2029; cash generated 2030 | −51; +39 | |
| Largest shortfall, before any cash cushion | 66, in 2029 | 126 by 2030 |
February plan as reported by The Information via The Decoder; September plan as reported by the FT. Both are OpenAI's projections, not audited figures. 97,102
So the money in hand carries OpenAI through 2027 with about $70B to spare, and it needs $66–126B more by 2030, depending on which of its own plans holds. The round now being raised, $30B or more, would cover 2028 on the February plan and about a quarter of the gap on the September one. For the rest it needs one of three things: the IPO, a new private round, or new terms with its suppliers. 104 That timing shapes our call. A company funded through 2027 does not have to cut anything before then. But before its IPO it does have to show investors a plan that pays for 2028, and the cheapest way to do that is to push some of 2028's bills into later years. So if a restructuring comes, the likeliest moment is the second half of 2027, around the IPO.
The new round was reported in late September as $30B or more at a $1.4T valuation. On October 24 Michael Parekh, a former Goldman Sachs internet analyst who writes the newsletter AI: Reset to Zero, citing CNBC and the FT, reported it trimmed to a $1.25T valuation, with commitments due October 30 and demand from wealthy private clients softer than pitched. We have not seen the original reports, so we treat the cut as unconfirmed. If it holds, it is the first sign that private money for OpenAI is getting harder to raise. 105
The revenue is on plan, for now
OpenAI's revenue figures look inconsistent at first, and the bear case uses that against it. Two numbers get quoted. The first is its run-rate: the revenue of its latest month multiplied by twelve, which was about $50B a year at the end of September. The second is the revenue it actually booked in its accounts. That was $6.7B in the second quarter, which times four is only $27B a year. A reader could take the gap as a sign that the run-rate is padded. It mostly is not. The run-rate grew more than 70% during the third quarter, so in early July it was about $28–29B, roughly the same pace as the second quarter's booked revenue. 106,13 The two figures differ because one is measured at the end of a quarter of very fast growth and the other is an average over the quarter before it.
A third number adds to the confusion. In late September Axios reported OpenAI's run-rate as nearly $70B. The $20B difference from $50B is a matter of definition. When OpenAI's models are sold through a partner, such as Microsoft's Azure OpenAI service, OpenAI counts only the share of the sale it receives. Anthropic counts the full price the customer pays. Axios's figure counted OpenAI's partner sales the way Anthropic does. So OpenAI's $50B and Anthropic's figures are not measured the same way, and Anthropic's look larger by comparison. In short, all three numbers are right. They measure different things. 107
On those figures OpenAI is roughly on track for the $36B of revenue its plan sets for 2026. The plan implies about $85B in 2027, which is within reach if OpenAI ends this year with a run-rate of $70B, as it is targeting. The hard years are 2028–30, when revenue has to climb from about $85B to $350B. Two warnings sit against the growth story. ChatGPT's weekly users have stayed near 900M since February, on secondary reports, so new revenue has to come from existing users paying more and from businesses. And the WSJ reported in April that OpenAI had missed its internal targets for users and revenue early in the year, a report the company called "ridiculous". 108 Anthropic has also filed to go public, so the two will be competing for the same investors' money at the same time.
Anthropic carries a bill almost as large
OpenAI is also not the only lab with a bill this size. Anthropic's public S-1 commits it to spend at least $114.5B with Google, $110.0B with Amazon and $44.9B with Microsoft whatever it uses, plus about $161.2B of rent on Broadcom TPU leases, up to $120.5B with SpaceXAI and other deals, roughly $800B in all. The press had reported $518B or more from the draft. 184,109,110 So the weak-link question has two names. What separates them is how much revenue each earns from its compute. On Parekh's arithmetic from the filing, Anthropic now earns $1.81 of revenue for each dollar of compute, up from $0.63 a year earlier. 105 SemiAnalysis adds a reason OpenAI's ratio is likely worse. Flat-rate subscriptions are only about 10% of Anthropic's revenue but use more than 40% of its inference compute, and they are a larger share of OpenAI's revenue. 111 A lab that earns more of its money from subscriptions needs more compute for each dollar it takes in.
The two labs also compete for the same customers, so their plans should not simply be added together. Each lab's plan assumes it wins. If the suppliers' backlogs carry both plans in full, they carry more demand than the two can jointly deliver, and the loser's contracts are the ones that get renegotiated.
Overcommitted buyers usually renegotiate before they default
Large buyers whose commitments ran far ahead of their revenue have usually renegotiated long before they defaulted. Whether it ended in a deferral or a default turned on one thing: whether the supplier wanted the customer to survive.
| Case | What happened | How soon after the stress showed |
| Airlines after 9/11 | Negotiated deferrals across the industry: Delta pushed back 39 jets and American 36. Boeing cut 2002 deliveries to about 400 from a planned 510–520 113 | 3–5 months |
| US gas pipelines, 1980s | Take-or-pay exposure fell from $10.7B in 1986 to $2.4B in 1989, mostly through settlements 114 | 3–5 years of talks |
| WeWork | Amended 590 leases, cutting rent by more than $12B, before its 2023 bankruptcy 115 | About two years of amendments, then default |
| Telecom start-ups and their equipment makers, 2000–02 | Vendor loans went bad. Lucent had $7B of financing committed; Winstar filed for bankruptcy and sued it in April 2001 116,117 | About a year after funding closed |
| Global Crossing | Chapter 11 in January 2002, sold for $250M 118 | About 21 months |
The table points to one lesson. The telecom start-ups defaulted because their suppliers had no reason to keep them alive and capital markets had shut, so nobody was willing to carry them. OpenAI's case looks more like the airlines' after 9/11. Its suppliers are also its shareholders: about two-thirds of the money it raised in 2026 came from Amazon, Microsoft, NVIDIA and Google, all of which sell it compute. A supplier that owns part of its customer would rather push a delivery back than force a default and book a loss on both the contract and the stake. It can often rent the capacity to someone else in the meantime.
Oracle takes the first hit
If OpenAI does cut or delay $100B of contracts, who loses? Spread across the cloud contracts in proportion to their size, the cut would take about $40B from Oracle's backlog, $37B from Microsoft's, $18B from AWS's and $3B from CoreWeave's. None of that would be fatal to any of them. The risk is that a cut would not be spread evenly. Oracle's Stargate contract is the newest, the least built and the most expensive to finance, so it is the obvious place to cut first. A cut of $60–100B there would be 9–15% of Oracle's $664B backlog. That matters more for Oracle than for the others because its credit is already weak. Oracle is rated BBB-, the lowest investment-grade rating, and its five-year CDS trades near 300bp, a level typical of junk-rated companies. 119,120 Oracle has also already borrowed for the sites due in 2028: about $38B for Texas and Wisconsin and $18B for New Mexico. 121 So a cut would leave Oracle with debt raised against revenue that no longer arrives on time. SoftBank is the next most exposed, through its stake in OpenAI, the bonds it sold to pay for it, and its own Stargate sites. NVIDIA has nothing at risk on OpenAI before 2028. Its guarantee starts in its fiscal 2029, and it pays only if the Ohio buildings fetch less than their guaranteed value. 9
NVIDIA's exposure to the edge as a whole is wider than that one guarantee. SemiAnalysis, reading NVIDIA's latest quarterly filing, counts $530B of obligations that sit off its balance sheet, up from $184B. They are $279B of supply commitments, mostly for memory and 96% due by fiscal 2029; $108.5B of guarantees, almost all of it the Ohio site; $36B of agreements to rent cloud capacity back from its customers; and about $20B of leases it expects to pass on to others. The rental agreements set minimum payments of about $2.35 an hour per GB300 chip, against a market rate of $4.50–4.60, and SemiAnalysis reports the programme is now paused. 122 The guarantees, rental agreements and leases add up to about $164.5B. With about $7B of equity in neoclouds, that matches the "more than $170B" of support for neoclouds that The Information reported. 105 NVIDIA is not only a supplier to the edge. It is partly its guarantor, so if the edge breaks, the losses come back to NVIDIA through these commitments as well as through lost orders.
Why OpenAI may pay in full
The case that OpenAI pays its bills is stronger than its critics allow. Its revenue is on plan through 2027. Capital is still arriving: $122B in March, a bridge round of $30B or more closing now even if at a lower valuation, and a 2027 IPO that could be the largest ever, which would also release Amazon's remaining $35B. Its counterparties own equity in it and would rather extend terms than write anything off. Compute can be re-let if OpenAI does not need it: Abilene's expansion went to another tenant, and Anthropic is signing for capacity wherever it can find it. Some of the obligations already flex by design. AMD's warrant vests only as capacity is deployed. Oracle has moved $75B of its AI backlog to capacity that is prepaid or uses customer-supplied chips, so it carries less of the cost. NVIDIA's guarantee does not start until 2028–29. The weakness of this case is that it rests on investors funding about $278B of cash burn through 2030, at a time when OpenAI's closest rival is asking the same investors for money.
How likely is a renegotiation?
The evidence so far leaves a narrower question than "will OpenAI pay?": will it change the terms first? No model answers that, so what follows is our judgment, and we show how we reach it. We start from the past cases in the table above. Buyers that had ordered far more than their revenue could carry usually renegotiated long before they defaulted, especially when their suppliers wanted them to survive, as OpenAI's do. Then we weigh what is particular to OpenAI.
First, the event, defined so it can be scored later. By December 31, 2027, at least $100B of OpenAI's contracted compute is cancelled or pushed back six months or more, at OpenAI's request, because it cannot fund it on the original terms. Delays caused only by a supplier's construction do not count. Nor does OpenAI moving work onto its own chip or between clouds: that changes who it buys from, not whether it can pay, and counting it would overstate the strain.
What OpenAI's executives said in interviews this autumn moves the odds down. 123
- They are short of capacity, not customers. The CFO, Sarah Friar, says OpenAI under-invested and with hindsight would have bought more compute last year (Big Tech Show, 0:22). The president, Greg Brockman, says "compute is revenue"; before its last launch OpenAI ranked which features to cut to free capacity (Odd Lots, 0:37). A buyer rationing capacity does not ask to push deliveries back.
- The plan has grown lately. It went from $600B in February to about $750B in July and $856B in September.
- The funding plan is equity and then debt, not deferral. Friar describes raising in public markets after an IPO, then moving to convertible bonds and plain debt (Business Post, 0:29).
- Revenue is on plan and the money lasts through 2027. Friar confirmed the $50B run-rate and 77% growth in the third quarter (Big Tech Show, 0:20).
Against that, three things keep the odds well above zero. The executives are describing their own company, unaudited. Friar did not answer when asked about the FT's estimate of about $280B of cash burn over five years (Big Tech Show, 0:19). And the bridge round may have been cut to a $1.25T valuation.
Weighing those, we put a renegotiation forced by OpenAI's finances at about 25%, within a range of 15–40%. We do not put a number on OpenAI moving work to other suppliers, because nothing public gives the size or timing of its own chip. A failure to pay stays at 10% or less, because the cash lasts past the deadline and the suppliers who would have to force a default are also shareholders who would rather wait.
If the edge breaks, this is the shape we expect: a renegotiation, not a default. Its cost lands first on Oracle's growth and credit, and on the chip orders for 2028 behind them, before it reaches the hyperscalers. That is a painful repricing for the edge and for the suppliers' later years. On its own, it is not a crisis for the core.
What would move the odds
These are the readings that would move our 25%, and when each arrives.
| Signal | When | Lowers it | Raises it |
| OpenAI's year-end net run-rate | about January | $70B or more: about 10 points lower | Under $60B: about 10 points higher |
| The bridge round, reported cut to $1.25T | commitments due October 30; closed by March 31, 2027 | Closes for $30B or more at $1.2T or more | Falls short of $30B, stalls or prices under $1.2T: about 15 points higher |
| The IPO | by September 30, 2027 | A public filing, whose commitment table settles the ledger | Slips into 2028: about 10 points higher |
| Oracle's results | mid-December and mid-March | Backlog grows; CDS under 200bp | Backlog falls, any talk of OpenAI rephasing, CDS above 400bp or a junk rating |
| Stargate sites | through mid-2027 | Abilene at its full 1.2 GW by Q1 2027 | A slip of more than two quarters at OpenAI's request |
| OpenAI's recognised Q3 revenue | likely reported by December | $10B or more | Under $9B |
Will the biggest buyers keep spending?
Into 2027, yes. Meta has already signed most of its 2027 spending, and SpaceX has become a large new buyer. The strain is in the cash: Meta's free cash flow turned negative last quarter, and SpaceX is financed more like a neocloud than a hyperscaler.
The edge decides who takes the losses. The core decides the chip cycle. If the cash-rich buyers keep raising capex in 2027, the cycle holds even while the edge strains. Two of the largest buyers reported last week. Neither gave a 2027 number, but both said more than a number would.
Meta has signed for heavy 2027 spending, and its cash flow has turned negative
In its third-quarter report, Meta narrowed its 2026 capex guidance to $135–145B, from $130–145B, after spending $34.9B in the third quarter, a figure that includes payments on finance leases. Its free cash flow for the quarter was −$2.1B: it spent more than it earned. Its cash of $82.4B is now below its debt of $83.7B. 124 Meta gives its first 2027 guidance on the fourth-quarter call in late January. For now, the CFO said, Meta is "quite early in developing our budget and capacity plans". An analyst on the call recalled management's earlier plan of "maximizing compute in 2026 and 2027" while keeping more room to adjust in 2028. 125
Much of Meta's 2027 spending is already contracted. Its quarterly filing lists $454.5B of commitments it cannot cancel, $121.4B of them due in 2027. Most are for rented cloud capacity, servers and network equipment. Some are for energy and Reality Labs hardware, so the figure is not a floor under capex alone. On top of that sit $355.7B of data-centre and energy leases that have been signed but have not yet started. 126 Cutting 2027 spending sharply would mean breaking contracts, so we do not expect a sharp cut.
The return on that spending is not yet visible in Meta's profits. Third-quarter operating income fell to $13.0B from $20.5B a year earlier, but that includes a one-off $9.89B legal settlement. Without it, operating income rose 11% to $22.9B. 124 So the quarter does not show the spending failing. It shows that the spending is running ahead of the cash it brings in: free cash flow was negative.
For the bull case, this is the firmest support that 2027 capex will grow: the money is already contracted. For the bear case, it is the clearest sign that spending is running ahead of its payback. The test comes in January, and we expect a raise. A raise on its own is not the warning. The warning would be a first 2027 guide with a midpoint above about $198B, roughly 40% above this year's midpoint, without a matching rise in Meta's revenue outlook. That would tell us Meta is spending past the point where the money earns its cost.
SpaceX: a giant new buyer, financed like a neocloud
Meta supports the case for continued spending. SpaceX adds a large new buyer, but one financed by borrowing, so it adds to the financing risk as well. It went public in June, and besides Starlink and its launch business it now runs an AI computing business that rents capacity to others. It guided fourth-quarter capex to $35–40B, against $19.6B in the third quarter. 128 That is a pace of $140–160B a year, as much as Meta spends. Its computing capacity will reach 2.5–3 GW by the end of the year, and Elon Musk said he is "highly confident" of adding 10 GW in 2027. 129 At our estimate of about $37B per gigawatt, 10 GW would cost about $370B. For scale, SpaceX spent $48.1B on capital in the first nine months of 2026.
The demand behind it is real on today's terms. SpaceX's AI computing revenue rose from $0.8B in the first quarter to $7.6B in the third, and it guides total revenue of $33–37B for the first quarter of 2027. 128,129 The CFO says new capacity rents for "slightly above the high end of the $30 to $50 per watt range" a year, which would pay back its cost in under a year. That is management's claim, not something we can check. 129
SpaceX's customers can leave within about six months; its debt lasts for years. Its computing contracts run for 90 days, and customers can exit with 90 days' notice. In nine months it spent $48.1B on capital against $13.1B of cash from operations, and closed the gap with its $85.7B IPO and $25B of bonds. 128,129 That is how the edge funds itself, not the core.
The revenue also shows capacity not yet earning. On the arithmetic of Tomasz Tunguz, a venture investor at Theory Ventures, from SpaceX's filings, its contracts price a GPU at about $5.27 an hour, but its AI revenue divided across its installed capacity comes to only $2.44. 130 Leaf Ye, a CFA who writes the GrowthStock newsletter, estimates that about 75% of the segment's revenue is short-term rental to a few labs at spot prices, possibly half of it from Anthropic. 131 If so, part of SpaceX's demand is Anthropic's demand resold, not a separate source.
What this does to the capex question. Chip demand in 2027 no longer rests only on the four hyperscalers. If SpaceX simply holds its fourth-quarter pace through 2027, it adds about $50–75B of spending over 2026's roughly $86B. That makes total 2027 capex more likely to grow, which supports our second call (in the calls table below): 85% that none of the big four plans lower capex for 2027 than for 2026. But it also moves more of the risk to the edge. The buyer adding the most is borrowing to do it, and its customers can leave at short notice. If rents fall, it is the one that cuts first. The scorecard under the verdict tracks both.
The verdict: the core can pay; whether it earns a return is open
Can the builders pay their bills? The cash-rich core can. The debt-funded edge is struggling, and its stocks already trade as if it has broken. Will the build earn its return? That is not settled for anyone yet. Will the stocks pay from today's prices? For the edge, the bad news is largely priced. For the core, the risk is returns that disappoint while AI keeps growing.
| Question | What answers it | The core | The edge |
| Can it pay its bills? | Cash, debt coming due, contracted payments, access to funding | Yes | Strained; priced as broken |
| Will the build earn its return? | Cash the new capacity brings in, after running costs, over its life | Unproven | Unproven, with less room for error |
| Will the stock pay from here? | Earnings it can hold, cash conversion, dilution and what the price assumes | The main open risk | Largely priced |
A disappointing return turns into a crisis fastest at the edge, because the edge borrowed to build. Its stocks already trade as if that has happened. Oracle, CoreWeave and the other neoclouds borrowed to build capacity that they lease to labs, and the labs' revenue has to grow 50% or more a year to pay for it. OpenAI has signed for more compute than its own plan can fund. The market has seen this. Oracle closed October 23 at $126.16, 62% below its peak close of $328.33 on September 10, 2025. CoreWeave closed at $54.24, 70% below its peak of $183.58 on June 20, 2025. 132 So the bubble at the edge is not a forecast. It is deflating now. Two questions remain: whether it has further to fall, and whether it spreads to the core. The edge is tied to the core. NVIDIA has agreed to buy capacity that AI clouds fail to sell and has guaranteed data-centre leases tied to OpenAI. Its filing warns that it may not recover what OpenAI has agreed to repay, promptly or in full. 133
Lenders draw the same line between core and edge. Apollo's president, Jim Zelter, expects debt for AI spending to stay plentiful at least until 2028. 134 But Blue Owl, a large data-centre landlord, says it will not lend on a lab's own credit. It needs a guarantor so that it is paid "come hell or high water" (Compound Interest podcast, October 8). Apollo's fixed-income partners also name the point where strain would spread: spreads on the best borrowers widening to 1.5–2 percentage points over Treasuries. Oracle is already at about 2. 135 So we expect money to stay cheap for buildings that an investment-grade cloud has leased, and to get dearer first for the labs, the neoclouds and Oracle.
Does the edge have further to fall? We think the price is not yet the bottom: CoreWeave's bonds still yield about 15%, and Oracle's credit is priced like junk. Does the strain spread to the core? History says the edge breaks first, and well before the spending stops. In the telecom bust, defaults started rising in 1999. The Nasdaq telecom index peaked in March 2000. High-yield telecom bond spreads reached 1,200bp in November 2000. Telecom capex fell only in 2001, two years after the first defaults. 136 Today's stress at the bottom of the credit market looks more like 1999's rising defaults than November 2000's blowout: the warning stage, not the crash.
We agree with Perkins about the mechanism and about what to do with a portfolio. We disagree about the odds. He writes as if the crash is certain and the only question is when. The section on outside money puts the odds of outside money covering the 2030 bill on time at about 45% counting Anthropic, and 20% without it. The section on OpenAI puts a renegotiation forced by OpenAI's finances at about 25%, and a failure to pay at 10% or less. That is real pain at the edge, but it is not, on its own, a further 40% fall in chip stocks from today's prices. For that we put the odds at about 17% over two years. The section on how far chips could fall shows how we get there.
On Palihapitiya's chokepoints: we agree the suppliers own the scarcest assets, and that is their strength. But chokepoints protect margins, not volumes. If the hyperscalers slow 2027 spending, chip orders fall first and fastest, as they did in every past semiconductor cycle. So on a real cut in investment, the suppliers are hit first.
What would prove us wrong
Both cases make claims that the next few quarters will test. These are the readings that would settle them, with where each stands today. The thresholds are our judgment, set before the October earnings.
| Metric | Today | The bull case holds if | The bear case holds if | Next reading |
| 2027 capex guidance, Microsoft, Alphabet, Amazon, Meta | Not yet given. Meta waits until late January, with $121B of commitments due in 2027 | All four guide growth of 20% or more | A cut in planned investment, including leases, against what was expected | Oct 28–29, then late Jan |
| Capex against operating cash flow, Q3 | 1 of 4 above 100% (Meta 103%), and Meta is now selling stock | Back under 100% as cloud revenue catches up | 2 or more above 100%, with debt or stock sales funding the gap | Oct 28–29 |
| Meta's first 2027 capex guide | Due late January | Midpoint under about $198B, or above it with a higher revenue outlook | Midpoint above about $198B with no rise in the revenue outlook | late January |
| How SpaceX funds its 2027 build | Q4 capex guided to $35–40B; nine-month capex 3.7× operating cash flow | Customer prepayments and its own cash flow | New debt, while its contracts stay at 90 days | Q4 report |
| Microsoft backlog growth excluding OpenAI | 25% | Holds at 25% or more | Falls under 15% | Oct 28 |
| OpenAI annualised revenue | Close to $50B (Sept) | $70B or more at year end, its own target | Under $60B at year end | Jan 2027 |
| Business AI adoption, Ramp AI Index | 55.9%, up 0.6 points in Sept | Rising a point a month again | Flat for three months | monthly |
| H100 rental price, Silicon Data index | $2.88 an hour, rising | Flat or rising | Down 20% over six months | monthly |
| NVIDIA net equity investment against free cash flow | 50.3% (H1) | Under 40% | Above 50% and rising | about Nov 18 |
| Oracle five-year CDS | ≈295bp | Back under 250bp | A weekly close above 300bp | weekly |
| CoreWeave new debt | 2031–32 notes ≈15% | Refinances inside SOFR+550 (the overnight dollar rate plus 5.5 points) | Wider than SOFR+550, or no buyers | about Nov 9 |
| Chip stocks, SOXX | $478, 27% below the peak | Back above $590, the early-October high | Below $393, 40% under the June peak | daily |
Most of these read for the bull case or sit between the two today. Only the credit readings, Oracle's CDS and CoreWeave's bonds, lean to the bear case, and that fits our view that the edge breaks before the core.
One bear reading is likely to trip this week. Our first call puts 70% on Alphabet or Amazon spending more than its operating cash flow in Q3; with Meta already at 103%, that would make two of the four. The funding half of that test is partly met already: Alphabet announced $84.75B of new stock in June, and on October 26 Meta announced a sale of about $35B, with up to $95B planned. 143,186 We would read that result as the spenders' shareholders taking on more of the risk, which is the risk we think prices carry least, not as a sign the build has stopped paying.
What is the market already pricing?
Most of what the bear case predicts is already in prices. The debt-funded builders are down 62–70%, and chip stocks trade as if this year's earnings boom is the peak: NVIDIA sits at 13 times next year's expected earnings, against 19 for the S&P 500. The broad index prices little fear. The S&P 500 is 2.5% off its record and above its 200-day average, while chip options price swings nearly three times the index's. We put 26.3% on the S&P 500 and the Nasdaq both falling a further 15% within a year, against a 19.5% long-run rate, which is close to the price. The one place we would look for a real gap is NVIDIA, but we have not built the model that would settle it.
Paper gains on AI stakes make Alphabet and Amazon look cheaper than they are
Alphabet and Amazon own stakes in the labs and in SpaceX, and when those companies raise money or go public at higher prices, the gain counts as profit. In the four quarters to June, those gains were about half of Alphabet's pre-tax profit and 46% of Amazon's. In the second quarter alone Alphabet booked $99.0B of gains on equity stakes, mostly SpaceX and an unnamed private company, which added $77.1B to its net income. Amazon booked $53.4B, mostly from its Anthropic shares. 137,100 These are marks on private or newly listed shares, not cash. For the labs, they come from the same money loop: the labs raise money, spend it on the clouds, and the clouds' stakes in the labs rise in value. Valued on operating profit instead, Alphabet and Amazon trade at twice the multiple their reported earnings suggest.
| October 23 prices | P/E, reported earnings, last 4 quarters | P/E, operating profit after 18% tax | Non-operating income, share of pre-tax profit | Free cash flow yield | P/E, next year's consensus |
| Alphabet | 16.1 | 32.6 | 51% | 1.4% | 20.9 |
| Amazon | 20.0 | 35.2 | 46% | −0.4% | 23.2 |
| Microsoft | 29.2 | 30.7 | 6% | 1.7% | 26.6 |
| Meta | 24.2 | 23.2 | 1% | 2.5% | 19.0 |
| NVIDIA | 26.7 | 31.6 | 14% | 2.5% | 13.4 |
| Oracle | 19.8 | 19.8 | none | −7.7% | 15.5 |
Last four reported quarters: to June 2026 for Alphabet, Amazon, Microsoft and Meta; to July for NVIDIA; to August for Oracle. Meta's third quarter, which carries a one-off $9.89B legal charge, is not yet included. Free cash flow is operating cash flow less cash capex, which leaves out finance-lease payments. Next year is calendar 2027, except Microsoft (year to June 2027), NVIDIA (year to January 2028) and Oracle (year to May 2027). Figures from filings and consensus estimates compiled by a market-data vendor; the 18% tax rate is our assumption. 138
Analysts already strip most of the gains out: their 2027 forecasts are below 2026's for Alphabet, $15.34 a share against $20.58, and for Amazon, $10.67 against $12.86, because they do not forecast new gains. So the next-year column is the fair one. On it, the four big buyers trade at 19–27 times next year's earnings, while their free cash flow, after the build, yields 2.5% or less, half the 5.0% on a ten-year Treasury. The buyers are priced for the build to pay off. Their shareholders, not their lenders, carry the risk that it pays off late.
Where we differ from the price
A view is only worth acting on where it differs from what prices already assume. The bear case in this letter is not news to the market: it is the reason Oracle and CoreWeave have fallen by two-thirds and chip stocks by a quarter. So before saying what to do, we set each of our views against what the price implies. Prices are October 23 closes; the earnings figures are analysts' consensus estimates. 132,138
| Stock or market | What the price assumes | Our view | Do we differ? |
| NVIDIA, $210.96 | 13 times the $15.81 a share analysts expect in the year to January 2028. At the market's 19 times, the price fits earnings of about $11.10, 30% below that. | A cut that size is possible from several causes. We have not built the earnings model that would say whether it is likely. | No call |
| Chip stocks (SOXX), 27% below the June peak | Options price a 22–23% chance that SMH, a chip fund, ends 2028 at least 40% lower. | 17% low confidence, 8–25%, because a bust that deep has needed a recession. | Slightly less bearish |
| Oracle, $126.16, 62% below its peak | Earnings in the year to May 2030 about 36% below analysts' $19.76 a share. | Our OpenAI odds say how likely a shortfall is, not how large it would be, and new share sales would dilute the estimates. | No call |
| S&P 500, 2.5% below its record | A 15% fall within a year has followed 19.5% of the time. | 26.3%. | No |
NVIDIA's price already assumes a sharp fall in earnings. Analysts expect its earnings to rise 70% next year, yet the stock trades at 13 times them, against 19 for the S&P 500. At the market's multiple, the price fits earnings of about $11.10 a share, 30% below next year's estimate. That multiple is our assumption, not a measurement: a stock at the top of a cycle usually trades below the market's multiple, so part of the discount is normal.
A cut of 30% could come from several places: slower spending in 2028, lower prices and margins as supply catches up, share lost to custom chips, or losses on the support NVIDIA gives its customers. On share, custom chips are gaining: OpenAI's first chip, Jalapeño, was built with Broadcom and is due from late 2026, and Google now sells its TPUs to outside customers such as Anthropic. 139,140 On spending, the 2027 guides are still rising: Microsoft says its capex will grow in the year to June 2027, and Meta has signed for heavy 2027 spending. 141 NVIDIA's filing shows it has committed to buy $87B of supply in its fiscal 2028 and $88B in fiscal 2029. 133 Those commitments say NVIDIA expects demand to hold, but a company that has signed for supply can be left holding it.
So NVIDIA's price already allows for a large fall in earnings. Whether it allows enough needs an earnings model through a full cycle, which we have not built. Until then we make no call on it.
The edge is largely priced. On a 15 times exit multiple and a 12% yearly return, Oracle's price fits earnings in 2030 about 36% below analysts' estimates. Both inputs are our assumptions. Our odds on OpenAI say how likely a cut is, not how deep, so they cannot tell us whether 36% is too much. Oracle is also funding the build partly by selling stock, and the estimates do not count the shares still to come. So we make no call on Oracle.
If the build keeps growing, the risk moves to the spenders' shareholders. If the October and January guides show 2027 capex rising 20–35%, the chip makers book the revenue while the spenders' cash flow gets worse, and the market has already shown it punishes that: Meta fell 9.4% in the week it raised its range. Whether the suppliers' stocks do better from here depends on how much of that revenue they keep as margin, which we have not modelled. Amazon is the steadiest of the spenders: Andy Jassy puts the payback on a server at about three years, against contracts of about five.
The broad market prices far less
Being right about the bubble does not tell you how far prices fall. So we turn to the broad market: what it already prices, and the paths the next year could take.
The question we test is whether the S&P 500 and the Nasdaq both fall 15% or more at some point in the next 12 months. For a base rate, we took each starting date in the long history of both indices and asked how often such a fall followed within a year. It followed about 19.5% of the time, with a 90% interval of 15.9–24.0%. We then tested 21 rules that might say today is riskier or safer than usual: trend, valuation, credit, volatility, oil, yields and the election cycle. Each rule was fixed before it was run on history, so it could not be tuned to fit. None passed. So history gives no tested reason to move far from 19.5% today. Our own judgment, built from the four scenarios below, is 26.3%. That number is not tested, and we show the arithmetic so a reader can change the weights.
The odds of a large fall are one question; what to expect is a wider one. After the 120 pullbacks like today's since 1928, the S&P 500's median return over the next year was +7.5%, about the same as any year. Semiconductors are where history splits: after past breaks like this one, they kept falling in some years and recovered fast in others. The full distributions are in What usually follows a market like this one.
The chart here is now drawn in the data section. It showed: Probability comparison: tested base rate 19.5 percent, judgment 26.3 percent with a 25 to 30 percent band, sensitivity case 32 percent.
The trend has not broken. The S&P 500 closed at 7,623.68 on October 23, 4.6% above its 200-day average of 7,291.31, the line many investors use to tell a rising market from a falling one. 142 For a bear market to start, investors need a reason to sell that lasts longer than the dip-buyers' appetite. Usually that is falling earnings, a rising discount rate (the return investors demand, which rises with interest rates) or forced sellers, such as funds meeting margin calls. Here is what we see on each front, in order of how much it matters.
Bearish · the main risk
The AI build has reached the financing stage
Meta's information statement speaks of "an increasingly challenging environment for raising capital". 7 The biggest spenders are no longer paying from cash alone: Alphabet announced an $84.75B package of new stock in June, Oracle sold $20B of stock, and on October 26 Meta announced about $35B of stock and convertible preferred, with a further $60B program planned for 2027. 143,144,186 When the richest companies start selling shares to fund the build, it has moved from spending spare cash to needing outside money. No buyer has cut capex yet, but this is the stage at which a cut becomes possible.
Bearish
A flood of new stock
118 US IPOs had raised $148.3B by late October, 3.4 times the total for all of 2025, and that includes SpaceX's $75B base deal. 145 Anthropic filed its public S-1 on October 26 and could list in November, and OpenAI is aiming for 2027. 146,184 Every new share needs a buyer. Investors who want AI exposure can now get it from new issues instead of from the market's existing leaders, and those leaders already make up a large share of the index.
Bearish
Oil is high and the Fed is still raising rates
This is the risk most likely to cause a recession. Front-month Brent crude, the price for delivery next month, is $116.72 a barrel. OPEC+ has only 0.27M barrels a day of spare capacity to add if supply falls further, and press reports of EIA data put the US strategic petroleum reserve at its lowest since 1982. 147 The Fed, meanwhile, is raising rates rather than cutting. It raised its target to 3.75–4.00% on September 16. Futures price a hold at the October 28 meeting and a 76–83% chance of another rise in December. 148,149 A Fed raising rates into an oil shock is what happened in 1973–74 and 1979–80, and both times the economy went into recession.
Mixed
Credit is breaking at the bottom only
The extra yield on CCC-rated bonds, the riskiest tier, is 13.40 percentage points over Treasuries, and Fitch puts the default rate on private-credit loans at a record 6.3%. 44,150 But the wider credit market is calm. The spread on all high-yield bonds is 340bp and on investment-grade bonds 89bp, and the Chicago Fed's index of financial conditions is loose at −0.50 (below zero means easier than average). 151,152,153 Spreads also widened while Treasury yields fell. When interest rates are the problem, both rise together. When spreads widen on their own, lenders are worried about particular borrowers. So this is a credit problem in the weakest companies, not a rates problem for everyone.
Mixed
Stocks pay little more than bonds
The forward earnings yield, next year's expected earnings divided by price, is about 5.35%. That is only 0.35 points more than a 10-year Treasury pays at 5.00%, so investors get little extra for owning stocks instead of bonds. 154 The 10-year real yield, the Treasury yield after inflation, is 2.64%. The cyclically adjusted P/E, which compares price with ten years of inflation-adjusted earnings, is 40.4, close to its record of 44.2 in 1999. 155,156 But the cushion is not gone. The forward P/E of 18.7 is already below its five-year average of 19.8, and Aswath Damodaran's estimate of the equity risk premium, the extra return that market prices imply over Treasuries, is a normal 4.20%. 157
Mixed
Strong but narrow earnings, and a soft consumer
S&P 500 earnings are growing about 29% in the third quarter. Take out NVIDIA and Micron and the growth is 20% (market data, October 16). 154 The rest of the economy is weaker. Employers added an average of 51,000 jobs a month over the past three months. Wages are up 3.0% against 3.7% inflation, so pay is falling after inflation. The University of Michigan's consumer sentiment index is 48.0. 158,159,160 That leaves the market more dependent on AI than its index weights suggest. If AI capex slows, the earnings growth and the market's leaders fail together.
Mixed
Hedge funds have sold; fund managers have not
Hedge funds sold global technology stocks from October 5 to 16 at a pace more than three standard deviations beyond normal, and Goldman puts their short bets, relative to their capital, near the 99th percentile of history. CNN's Fear & Greed index, a composite of sentiment measures, is 21, in its "extreme fear" zone. 161,162 Trend-following funds, which buy rising markets and sell falling ones by rule, cut their stock holdings from $125B to about $39B. 163 A washout like that often marks a low, because the sellers have already sold. But the investors who allocate money over quarters rather than weeks are still heavily invested. Global fund managers are a net 37% overweight technology and hold only 3.9% of their funds in cash. The NAAIM index of active managers' stock exposure is 87.7, where 100 means fully invested. Margin debt, money borrowed to buy stocks, is up 31% on the year, and a leveraged chip fund took in a record $7B in a week. 164,165,166,167 The professionals who trade weekly have sold. The ones who allocate quarterly have not, so there are still sellers left if the news turns.
Mixed
Chip options price big swings; index options do not
Implied volatility is the size of the swings that option prices assume. For one-month options it is 44.9% a year on SOXX, the main chip fund, against 15.7% on SPY, the S&P 500 fund. In SOXX, SMH and QQQ, protection for the next few weeks costs more than protection for later months, the shape of a market that fears something soon. 168 Option dealers in SPY were net short gamma, about −$23B on Unusual Whales' estimate. That means the dealers' own hedging makes them sell as prices fall and buy as they rise, which makes moves bigger rather than smaller. 168 Options also cost more than the moves funds have actually made, everywhere we looked. A scared market looks like that before a low as often as before a crash, so this reading does not pick a side.
Mixed
Funding markets have little spare cash
The term premium, the extra yield investors demand for holding long-term Treasuries rather than rolling over short ones, rose from about 0.49 to 0.82 points in a year. Bank reserves at the Fed fell to $2.96T. The Fed's reverse-repo facility, a pool of spare cash that money funds park at the Fed and that cushioned earlier drains, is down to $0.2B. 169,170 The federal deficit for fiscal 2026 was $1.99T, so the Treasury keeps selling large amounts of debt into this market. 171 Nothing is broken, but there is little room to absorb a shock.
Four ways the next 12 months could go
These are judgment weights, held with low confidence: each could be 10 points higher or lower. The last column names the readings that would move each one.
| Path | Weight | What happens | Chance of a 15% fall | What moves the weight |
| Rotation and churn | 48% | Oil eases roughly as futures price it, the Fed hikes once or twice, capex keeps growing. The index swings ±10% while AI and energy trade places. | ≈10% | Takes the weight the other paths give up |
| AI financing squeeze | 22% | 2027 capex guidance disappoints, or equity raises land badly. AI names fall 30–50% and the index 12–20%. This is Perkins's path, a year early. | ≈50% | To 40% if the big four cut planned 2027 investment, or Oracle's CDS closes a week above 300bp. To 15% if all four guide 20% or more and OpenAI ends 2026 at $70B or more. Cut from 25% on Oct 26 after Anthropic's S-1 |
| Oil and the Fed | 15% | Strikes on Iran push Brent above $130, core inflation tops 3%, the 10-year breaks 5.4% and the Fed keeps hiking. | ≈70% | To 25% if Brent closes above $130 or October core CPI tops 3%. To 5% if Brent falls under $100 |
| Relief rally | 15% | A Hormuz settlement takes Brent under $90, the Fed pauses and capex beats. The S&P runs past 8,400. | ≈0% | To 25% if the Fed holds in December and Brent is under $100 |
0.48×10% + 0.22×50% + 0.15×70% + 0.15×0% = 26.3% (27.5% before Anthropic's S-1, with weights of 45% and 25%). If the AI path's weight rose to 40%, taken from churn, the sum would be 33.5%. If the AI path's chance of a fall were 40% rather than 50%, it would be 24.1%.
The popular sell signals fail on history
A widely shared daily signal report called the market "bearish into next week". We tested its six signals back to 1955 where data allow: QQQ and SPY below their 50-day averages, small caps below their 200-day average, consumer staples outperforming, credit spreads widening, a split between stocks making new highs and new lows, and a rising VIX (the market's fear gauge). None passed. A few raised the odds of a fall on paper: staples leading by 1.76 times the normal rate, a rising VIX by 1.23 times. But the effect varied too much from one era to the next to tell from chance. An oil shock came closest to passing, at 1.57 times, but that signal is not on today. The one rule that nearly passed points the other way. After a midterm-election October like this one, a 15% fall followed only 10% of the time, about half the usual rate.
How far could chips fall?
Five measures, from chip-cycle history to option prices, point the same way. We put about 40% medium confidence, 33–50% on chips reaching 40% below the June peak, an ordinary chip-cycle bottom, and about 17% low confidence, 8–25% on a bust that takes them a further 40% lower from here, which in the past has needed a recession.
Two numbers matter for an investor: how likely a big fall is, and how deep it would go. No single method answers either well, so we use five and see where they agree. All are measured from the October 23 close, and chip stocks start this exercise well into a sell-off. The broad market has barely moved. 172
| Fund | Peak close | Oct 23 close | Below peak | Since early Oct |
| SPY, S&P 500 | $779.09, Oct 6 | $759.97 | −2.5% | −2.5% |
| QQQ, Nasdaq 100 | $759.66, Oct 6 | $704.40 | −7.3% | −7.3% |
| SMH, chip stocks | $668.91, Jun 22 | $527.20 | −21.2% | −16.8% |
| SOXX, chip stocks | $655.01, Jun 22 | $478.20 | −27.0% | −18.9% |
So "a 40% fall in chip stocks" can mean two very different things, and we give odds for both.
The chart here is now drawn in the data section. It showed: SOXX ruler: peak $655, October 23 close $478, an ordinary bottom 40% below the peak at $393, a bust a further 40% from today at $287.
Chip history: half the falls this deep reached 40% below the peak
The PHLX Semiconductor Index (SOX) gives us the longest history; SOXX tracked it until 2021 and moves closely with it. It has fallen 20% or more below its two-year high 13 times since 1994, not counting this one. 172
The chart here is now drawn in the data section. It showed: Depth of each fall of 20% or more in the PHLX Semiconductor Index since 1994, measured from its two-year high. The recession downturns of 2000 to 2002 fell 74%, 2007 to 2009 66% and 2020 34%. The others ranged from 21% to 49%. The current fall is 25% so far..
- Ten of the 13 got as deep as today's 25%. Half of those ten went on to 40% or more. The median final depth was 42%.
- Chips can fall 45–50% without a recession. The 1995–96 and 1997–98 inventory gluts and the 2022 rate shock all did. That is the chip cycle doing what it does.
- Only the two recessions went past 49%: 2000–02 fell 74% and 2007–09 fell 66%. The bust our 17% describes, 56% below the peak, is deeper than every other fall and shallower than those two. Two cases cannot show that a recession is required, and an investment bust can itself cause one.
Broad bear markets: the deepest came with recessions
Since 1971 the Nasdaq Composite has fallen 20% or more below its two-year high 13 times. The median fall was 30%. Three went past 50%: 1973–74, 2000–02 and 2007–09, and each came with a recession. The S&P 500 has had 11 bear markets since 1950. The seven that came with a recession had a median fall of 36%; the four without one, in 1962, 1966, 1987 and 2022, had a median of 27%. 172
Past booms: outside 1929, a doubling did not raise the odds of a crash
The third measure looks at what happened after past booms in any industry, not just chips. Ken French's data split US stocks into 49 industries going back to 1926. We looked for industries whose stocks had doubled in two years, as AI hardware did into this year, and asked how often they fell a further 40% within the next two years. It happened 17% of the time, and 22% for the fastest, most volatile run-ups like today's. But most of that signal comes from the 1929 crash. Leave out 1928–37 and the rate drops to 8%, below the 9.8% chance of such a fall for any industry in any month. Outside the Depression, a doubling has not made a crash more likely.
Option prices: about a one-in-five chance of a chip bust
The fourth measure reads the odds that option prices imply. Put options pay out if a fund falls below a set price, so their prices can be turned into a market-implied chance of a fall. Puts on SMH, a chip fund, price a 22–23% chance that it ends December 2028 at least 40% below today, and 33% for a fall of 30% or more. For QQQ, the Nasdaq-100 fund, the figures are 11–12% and 16–17%. These odds are biased in both directions. Buyers pay extra for protection, so option prices overstate real-world odds. But they price only where the fund ends on that date, not its low along the way, so they understate the chance of touching a level.
Short-dated options tell the same story. On October 23, one-month options on SMH and SOXX priced moves of ±8.0% and ±8.8%, about 2.6 and 2.9 times SPY's ±3.1%. 168 In all four funds (SPY, QQQ, SMH and SOXX), implied volatility sat 6–7 points above the swings the funds actually made over the past month, and puts cost more than calls. For SMH, SOXX and QQQ, one-month volatility is above three-month volatility. That shape, called backwardation, means buyers fear the next few weeks more than the months after. SPY shows the normal, calmer shape, with volatility low for its past year.
Part of the chip funds' fear is about NVIDIA's results, expected around November 18, near the end of the one-month window. Broadcom and TSMC, which do not report in that window, show the calm shape, with volatility near the bottom of their one-year range. 168 So the market is paying for protection on chip funds and on tech as a group, not on the broad index or on the largest suppliers one by one.
Our scenarios: about 41% on an ordinary chip bottom
The fifth measure starts from scenarios rather than history. The section on what the market prices weighs four paths for the next year. In the AI financing squeeze, which we weight at 22%, AI stocks fall 30–50% and the index 12–20%. Perkins's scenario plays out a year later: a mild recession, AI stocks down 40% and the S&P 500 down 30% by April 2028. 8 Neither path reaches a 2000-style bust in chips. For each path we estimate the chance that chips fall to 40% below their June peak: 90% in the squeeze, 60% if oil and the Fed cause a slowdown, 25% in churn and none in a relief rally. Weighted by how likely we think each path is, that comes to about 41% (43% before the S-1 moved weight from the squeeze to churn).
Combined: 40% on an ordinary bottom, 17% on a bust
| Event | What the five measures say | Our estimate | Confidence |
| Chip stocks reach 40% below the June peak (SOXX about $393) within two years | Chip history 50% (5 of the 10 that got this deep). Our paths 41%. SMH options about 33% for a fall to 45% below the peak, priced at the end date only | 40% | medium 33–50% |
| Chip stocks fall a further 40% from today (SOXX about $287, 56% below the peak) within two years | Chip history 20% (2 of 10 went past 60%, deeper than the 56% here). Industry run-ups 17–22%, or 8% without 1929. SMH options 22–23% | 17% | low 8–25% |
| The S&P 500 and the Nasdaq both fall a further 15% within a year | Base rate since 1955 19.5%. Of 21 signals we tested, none moves it. Our four paths 26.3% | 26.3% | low 20–35% |
| How deep, if it happens | Without a recession: chips 40–50% below the peak, the S&P 500 20–30%. With a long recession and investment bust, as in 2000–02 and 2007–09: chips 65–75%, the S&P 500 35–50%. The short 2020 recession took chips down 34% | the kind of recession decides it | |
The 17% is our judgment, not an average of the five measures. Their figures run from 8% (industry run-ups, leaving out 1929) to 23% (SMH options), and the middle of the run-up, option and chip-history figures is about 20%. We sit below that middle for one main reason. Every past chip fall this deep came with a long recession, and we expect 2027 capex to keep growing (call 2, at 85%), which makes a recession set off by AI less likely. They also measure different things: options price where a fund ends on one date, while history measures the lowest point along the way. We also sit below the chip history on the 40% for an ordinary bottom, for the same reason.
Two cautions apply. Thirteen chip downturns and 11 bear markets are small samples, and the busts cluster in two episodes, 2000–02 and 2007–09. And only the option prices reflect this year's stock sales and credit stress; the historical measures cannot, and both push the odds up.
What this says. The likeliest outcome is that the chip sell-off ends somewhere between today's level and 40% below the peak: a normal, painful chip-cycle bottom, with the broad market down far less. The busts that went that deep have come with a recession. That is why the recession signals we watch, jobless claims and credit spreads, matter as much as the AI news.
It also sets the bar for the portfolio section. After a fall like today's 27%, chip stocks rebounded whenever the cycle held, as in 2018 and 2020. A capex warning matters because it can mark a turn in spending. A falling share price, on its own, does not.
What it means for a portfolio
Keep broad equity exposure, but reduce how much of it rides on AI. The layers of the AI trade do not carry equal risk, so the order in which they break matters more than the size of any one bet. Turn bearish on the market if the S&P 500 closes below its 200-day average, high-yield credit breaks, or the big four cut planned 2027 investment.
Broad exposure. The tested odds of a bear market are close to their long-run rate. Our 26.3% is about seven points above it, a small edge on an untested judgment. In the two paths that carry 63% of our weight, churn and a relief rally, the index ends the year flat or higher, and a seller would have to buy back higher. Perkins makes the same point from the other side: those who shorted the boom too early lost money for years.
Concentration, not exposure. In the AI financing squeeze, AI stocks fall 30–50% while the index falls 12–20%. A portfolio that is mostly AI takes that squeeze at close to full size, so holding the market is not the same as holding an AI-heavy portfolio. As a rough guide, on our arithmetic, a portfolio with about 60% in AI stocks would fall roughly 20–30% in the squeeze, and more with leverage. Its owner should set that against the largest fall they will accept.
- The edge breaks first. Oracle, CoreWeave, the other neoclouds and the private labs carry the most risk, and their prices already show much of it.
- Suppliers are hit first on a real cut. If the first of the big four (Microsoft, Alphabet, Amazon and Meta) cuts its planned 2027 investment, which we put at about 15%, chip orders fall first and fastest. In the likelier case, where the big four guide 2027 capex up 20–35%, the suppliers book that spending as revenue while the spenders' cash flow gets worse.
- For the hyperscalers, the line is rents. The danger is capex staying above operating cash flow while GPU rents turn down: the core borrowing to build capacity that is losing value. The first half of that test is already met: Alphabet and Amazon spent 115% and 119% of their operating cash flow on capex in Q2, and Meta 103% in Q3. So in practice the line is the one in the scorecard: the H100 rental index down 20% over six months.
- The end of the chip sell-off. We would call the chip sell-off over if SOXX closes back above $590, its early-October high.
| Layer | What breaks it | First warning |
| Oracle, CoreWeave and other neoclouds | A large tenant renegotiates while their debt comes due | Oracle CDS above 300bp; CoreWeave new debt wider than SOFR+550 |
| OpenAI and other private labs | Revenue arrives after the compute bills | Exits 2026 below $60B annualised; next round priced below $852B |
| Suppliers: NVIDIA, TSMC, ASML, Broadcom and chip funds | A capex cut, or losses on support given to customers | A cut in planned 2027 investment, including leases, against what was expected; NVIDIA's net investment above 50% of its free cash flow and rising |
| Hyperscalers: Microsoft, Alphabet, Amazon, Meta | Return on capex falls short, so free cash flow and multiples fall | Capex above operating cash flow; GPU rents turning down |
| Software and applications | Spend concentrates in a few firms | Business AI adoption flat for three months |
The hyperscalers earn on compute whichever lab wins, and even in Perkins's crash their credit holds. The suppliers sit one step closer to the edge.
Turn bearish on the market if the S&P 500 closes below its 200-day average; if high-yield spreads close a week above 350bp while investment-grade spreads are above 100bp; or if the big four cut planned 2027 investment. We read a guide as calendar-year investment including leases, compared with what was expected and checked against orders at the suppliers, not as one reported capex line. A cut would also lift the AI path to 40% and our market odds to 33.5%.
Five calls to score us on
These are our judgments, not back-tested rates. Each states what would prove it wrong. Confidence says how firmly the evidence pins the number down, and the range is where we think the true odds could sit. High: reported figures carry most of it. Medium: the evidence points one way, but the outcome turns on decisions not yet made. Low: few precedents, or the measures disagree.
| Call | Odds | Confidence | Scored | Basis | Wrong if |
| 1. Capex tops operating cash flow at Alphabet or Amazon in Q3 | 70% | high 60–80% | Oct 28–29 | Q2 capex was 115% of operating cash flow at Alphabet and 119% at Amazon, so both spent more than their operations brought in. Meta's Q3 is already 103% on purchases of property and equipment; Microsoft's Q2 was 65%. 41,38 | Both report Q3 capex at or below operating cash flow |
| 2. None of the big four plans lower capex for 2027 than for 2026 | 85% | high 75–90% | by Feb 2027 | Backlogs: Microsoft $678B (+84%), Google Cloud $514B, AWS about $496B. Over 60% of 2027's data-centre capacity was not under construction in June. 51,52,173,174 | Any of the four guides 2027 below 2026 |
| 3. OpenAI and Anthropic reach $178B annualised together by Q3 2027 | 65% | medium 50–75% | Oct 2027 | OpenAI at $70B and Anthropic at $67B would put them at $137B by year end, needing 30% more in nine months. Against it: 50%-a-year growth is rare at this size, and big-firm spend per employee was flat in August–September. 73 | Combined under $178B. If OpenAI exits 2026 below $60B, we cut this to 45% |
| 4. OpenAI cuts or pushes back at least $100B of compute commitments because it cannot fund them | 25% | low 15–40% | by end-2027 | $665B of purchase commitments against a $50B run-rate; funded through 2027 but not 2028; its executives say capacity, not demand, is the limit. 10% or less on a failure to pay. The section on OpenAI sets out the case. 88,87,175 | Changes total less than $100B. If OpenAI exits 2026 below $60B, we raise this to 35% |
| 5. Credit breaks at Oracle or the neoclouds (Oracle's CDS closes a week above 300bp, or CoreWeave cannot refinance inside SOFR+550) before any hyperscaler cuts capex | 80% | medium 65–90% | by end-2027 | Oracle's CDS near 300bp, negative free cash flow and a $20B stock sale; CoreWeave's notes near 15%. 39,40,42 | A big-four capex cut comes first, with Oracle's CDS under 300bp and CoreWeave's new debt inside SOFR+550. If neither happens by end-2027, the call is wrong |
The market lines we watch
The market and economy lines we watch, each set before this week. The AI lines are in the scorecard under the verdict.
| Line | Now | Threshold | State |
| S&P 500 against its 200-day average | 7,624 | below 7,291 | a 4.4% fall away |
| High-yield spread, weekly close | 340bp | above 350bp | 10bp away |
| Investment-grade spread | 89bp | above 100bp | off |
| CCC spread | 13.40% | above 13% | crossed |
| 10-year Treasury while oil rises | 5.00% | above 5.2% | off |
| 10-year real yield | 2.64% | above 3.0% | off |
| Initial jobless claims | 194K | 230–240K | off |
| Payroll growth, three-month average | 51K | below 0 | off |
Credit and rate readings are FRED closes from October 22–23. 151,152,44,155,176
Earnings week: what each number would tell us
The first test comes this week. For each reading, the table gives what the company guided or analysts expect, and the result that would move us. We read capex against expectations and with leases added back, because three of the four now build partly outside the capex line. Microsoft moved some data-centre leases out of capex in July, which cut its reported 2026 figure from about $190B to $175B with no change in what it builds. Alphabet is renting outside capacity as a bridge, which counts as an operating cost. Meta's Louisiana campus sits in a joint venture that Meta leases. 177,178
| Company and reading | Guided or expected | Reads bearish | Reads bullish |
Microsoft, Oct 28 after the close Azure growth, constant currency | Guided 44–45%; consensus 44.9%; investors want about 46% (Bernstein, as reported) | Under 44% | 46% or more |
| Microsoft: commercial backlog growth excluding OpenAI | +25% last quarter | Under 15% | 25% or more |
| Microsoft: capex | Quarter guided above $50B including finance leases; capex for the year to June 2027 to grow; consensus about $194B | Quarter under $50B, or the growth guide withdrawn, after adding back leases moved off capex | Above $50B, growth reaffirmed |
Alphabet, Oct 28 after the close Google Cloud revenue | About $29.0B, up 91% (Bloomberg consensus, as reported) | Growth under 80% | Above $29.2B |
| Alphabet: capex | 2026 guided $195–205B; 2027 consensus $308B, up 52% | A 2027 indication below about $260B, 15% under consensus | At or above consensus |
Amazon, Oct 29 after the close AWS growth | Consensus 38% (BNP Paribas, as reported); investors want 43–45% | Under 38% | 43% or more |
| Amazon: capex | 2026 about $220B of cash capex; 2027 consensus $278B, up 26% | A 2027 indication below about $236B | Above $278B |
| Alphabet and Amazon: earnings | Consensus EPS $3.03 and $1.96 | Read profit without gains on stakes in the labs and SpaceX, which reached $99.0B and $53.4B in the second quarter |
Guidance from each company's last results call; consensus from market data, Bloomberg via moomoo, MarketScreener and broker notes as reported. Consensus is press-reported where marked. 177,179,180,181
What we change. We count a capex reading as a cut if a company lowers a guide it has given, or points to 2027 spending more than about 15% below consensus once leases are added back; the 15% is our judgment. A cut at any of the three triggers the October 28–29 row in the table below: market odds from 26.3% to 33.5% and chip-bust odds from 17% to about 25%. Cloud growth on the bearish side at two of the three would cut our odds that outside revenue covers the 2030 bill on time from 45% to 35%, because it would mean customers outside the labs are not yet taking up the load. Bullish readings at all three leave the call unchanged until Meta's 2027 guide in late January.
What would change our views, by date
Each row is a dated reading, what it would take to move us, and how far. Where the move is in our market odds, it comes from re-weighting the four paths in the section on what the market prices: a 26.3% chance of a further 15% fall in the S&P 500 and the Nasdaq within a year. The other moves are our judgment, set before the readings arrive.
| When | Reading | Bearish result and what we change | Bullish result and what we change |
| Oct 28, 11:00 PT | Fed decision; futures price a hold. September PCE prices and Q3 GDP follow at 5:30 PT on Oct 29. Core PCE already runs about 3%, so it is context here, not a trigger | A surprise hike. The oil-and-Fed path 15% → 25%; market odds 26.3% → 33.5% | A hold, as priced. No change |
| Oct 28–29 | Microsoft and Alphabet (Oct 28), Amazon (Oct 29): first word on 2027 capex | A cut in planned investment, including leases, against what was expected, as defined in the earnings-week table (we put this at about 15%). Market odds 26.3% → 33.5%; chip bust 17% → about 25% | All guide growth of 20% or more. Market odds → 23.5% once Meta does the same in late January and OpenAI ends 2026 at $70B or more |
| Oct 28–29 | Microsoft backlog growth excluding OpenAI; AWS growth and how much of its backlog is the labs | Microsoft under 15%, or the labs over half of AWS's backlog (about 40% now). Outside-money odds 45% → 35% | Microsoft at 25% or more and AWS growth holding. No change |
| Oct 30 | OpenAI's bridge round, commitments reported due | Under $30B, stalls, or priced under $1.2T. OpenAI renegotiation 25% → 40% | $30B or more at $1.2T or more. 25% → 20% |
| Filed Oct 26; roadshow reported from the week of Nov 9 | Anthropic's S-1 (read: revenue held up, Q2 made an operating profit, compute minimums of $269.4B with the three clouds; the update). Still to come: price range, run-rate at Oct 31, total commitments, and demand for the shares 182,184 | An offering cut or priced below its range. Outside-revenue odds 45% → 35%; financing squeeze 22% → 30%; OpenAI renegotiation 25% → 30%, since the two raise from the same investors | Already applied on Oct 26: outside-revenue odds 40% → 45%, squeeze 25% → 22%. Strong demand for the shares: squeeze 22% → 20% |
| Oct 26 to two weeks after pricing | Meta's stock sale: about $35B now, a $60B program planned for 2027 (the update) 186 | The offering is cut, or Meta closes 10% or more below its October 23 close of $642.62. The financing squeeze path 22% → 25%; market odds 26.3% → 27.5% | Prices at or near the reference with the options taken and the chipmakers' interest confirmed, and Meta holds within 5% of $642.62 for two weeks. The financing squeeze path 22% → 21%; market odds 26.3% → 25.9% |
| Nov 6, then weekly | October jobs report; jobless claims every Thursday | Claims above 230K for four weeks. Chip bust 17% → about 25%: every chip fall past 60% since 1994 came with a recession | Claims stay near 194K. No change |
| Nov 10 | October consumer prices | Core CPI up more than 3% on the year (2.6% in September). We use CPI because core PCE already runs about 3%. The oil-and-Fed path 15% → 25%; market odds 26.3% → 33.5% | Core CPI at 2.6% or lower. No change |
| About Nov 9, not announced | CoreWeave's results and the terms of its new debt | Priced wider than SOFR+550 (the overnight dollar rate plus 5.5 points), or no buyers; or Oracle's CDS closes a week above 300bp (about 295bp now). The financing squeeze path 22% → 40%; market odds 26.3% → 33.5% | Refinances inside SOFR+550. The financing squeeze path 22% → 20%; market odds 26.3% → 25.5% |
| About Nov 18, not announced | NVIDIA's results and its quarterly filing | A weaker data-centre outlook, falling gross margin, or losses on the cloud capacity and leases it has backed. Chip bust 17% → about 22% | Outlook and margin hold. No change |
| Dec 9 | Fed decision; a hike is 76–83% priced | A hike with core CPI above 3%. Treated as the Nov 10 row | A hold with Brent under $100. The relief-rally path 15% → 25%; market odds 26.3% → 25.3% |
| About Dec 9, not announced | Broadcom's results: its custom-chip revenue outlook | Custom-chip growth guided well above NVIDIA's: share is moving | Custom-chip growth in line with NVIDIA's |
| About Dec 14, not announced | Oracle's results | Backlog falls, any talk of OpenAI spreading out its contracts, or CDS above 400bp. OpenAI renegotiation 25% → 35% | Backlog grows and CDS under 200bp. OpenAI renegotiation 25% → 20% |
| January | OpenAI's year-end revenue run-rate (about $50B in September) | Under $60B. OpenAI renegotiation 25% → 35%; the labs' revenue call 65% → 45% | $70B or more. 25% → 15% |
| About Jan 27, not announced | Meta's results and first 2027 capex guide | Midpoint above about $198B with no rise in its revenue outlook. The core buyers' returns keep falling | Below $198B, or above it with a higher revenue outlook |
| Monthly | H100 rental price, Silicon Data index ($2.88 an hour) | Down 20% over six months. Outside-money odds 45% → 35%; OpenAI renegotiation +5 points | Flat or rising. No change |
| Any day | The market lines in the table above | The S&P 500 closes below its 200-day average (7,291), or high-yield spreads close a week above 350bp while investment-grade spreads are above 100bp. Turn bearish on the market | SOXX back above $590, its early-October high. The chip sell-off is over |
Dates marked "not announced" are estimates from market data and a market-data vendor, read October 25. Earnings dates are from company investor sites where announced. 183